Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of Manually Unloaded Coal In Muh Area And Lying Between Railway Track Of Inhaul Of Wt 2 And 3 To Wt Hopper /Muh In Ptpp Parichha
|
Description |
Shifting Of Manually Unloaded Coal In Muh Area And Lying Between Railway Track Of Inhaul Of Wt 2 And 3 To Wt Hopper /Muh In Ptpp Parichha
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1180 |
EMD | 24000 |
Tender Value | |
Place | PTPP Parichha |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 19:30 |
End Date |
12/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreCleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Read moreMaintenance of railway track and other related capital works in rail yard , ptpp , parichha
Maintenance of railway track and other related capital works in rail yard , ptpp , parichha
Read moreRepairs to shed, parking arae, plinth protection, moorum filling in lowc lying area and certain b and r works under aor of age b and r-ii chandipur
Repairs to shed, parking arae, plinth protection, moorum filling in lowc lying
 area and certain b and r works under aor of age b and r-ii chandipur
Read moreRepair to rcc roof water proofing treatment and repair replacement to flooring plastering wall seepage plumbing sanitary fittings to certain buildings in no 2 and 3 domestic area at air force station pathankot
Repair to rcc roof water proofing treatment and repair replacement to flooring plastering wall seepage plumbing sanitary fittings to certain buildings in no 2 and 3 domestic area at air force station pathankot
Read moreDay to day repair/maintenance work in no 2 and 3 area at afs pathankot
Day to day repair/maintenance work in no 2 and 3 area at afs pathankot
Read moreFabrication of spares for bpcl make pumps of 63/65-10, 43-7, 33-5 models in area 2 and area 3 installations of ahmedabad asset
Fabrication of spares for bpcl make pumps of 63/65-10, 43-7, 33-5 models in area 2 and area 3 installations of ahmedabad asset
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreof your Industry type