Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 Toilet (Boys And Girls) At Gsss Gegal Block Ajmer Rural Distt Ajmer Under Dmft Project
|
Description |
Construction Of 2 Toilet (Boys And Girls) At Gsss Gegal Block Ajmer Rural Distt Ajmer Under Dmft Project
|
Organisation | Government of Rajasthan |
Tender Id | 2023_RCSCE_364683_19 |
Reference Number |
NIT-19/2023-24 ADPC SMSA AJMER |
Tender Fee | 1000 |
EMD | 14580 |
Tender Value | |
Place | ADPC SMSA Ajmer |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 12, 2023 15:30 |
End Date |
21/09/2023 ( Expired 602 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreConstruction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur
Construction of additional foundations for 2 no 66kv line bay at 66kv s/s naugajja and 1 no 66kv line bay at 66kv s/s mustfapur (under op. circle kapurthala) (twl no. 60/nz/2023-24/annex-b)
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreRepair and resurfacing of existing road and furniture items at various location central areas under age b/r-ii at mil stn bhuj
Repair and resurfacing of existing road and furniture items at various location central areas under age b/r-ii at mil stn bhuj
Read moreConstruction of technical buildings and allied infrastructure under ge (p) nagrota
Construction of technical buildings and allied infrastructure under ge (p) nagrota
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Read moreof your Industry type