Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cmrl/Phase Ii/Pd/Cs/Tdr 21/Sg 01/2024
|
Description |
Consultancy Services For The Upgradation Of Phase I Metro Graphical Guidelines For The Implementation In Phase Ii Metro
|
Organisation | Chennai Metro Rail Limited | Central Govt. Ministry/Department |
Tender Id | 2024_CMRL_825367_1 |
Reference Number |
CMRL/PD/CS/TDR-21/SG-01/2024 |
Tender Fee | 8000 |
EMD | 30000 |
Tender Value | |
Place | Chennai |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=867370 |
Start Date | September 27, 2024 14:30 |
End Date |
09/10/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConsultancy services for dpr preparation of kusumba-dondaicha -shahada section of nh- 160h, mp borderpalpadiya-raver section of nh 347c and satana city bypass of nh 752g
Consultancy services for dpr preparation of kusumba-dondaicha -shahada section of nh- 160h, mp borderpalpadiya-raver section of nh 347c and satana city bypass of nh 752g
Read moreConsultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha
Consultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreof your Industry type