Tender Details
About Tender
๐ Procurement Opportunity: Final Location Survey For Guwahati Lumding 3rd Line Extension ๐๐ค๏ธ The Ministry Of Railways, Central Government, Invites Tenders From Experienced Firms For Conducting A Comprehensive Final Location Survey For The 3rd Line Between Guwahati Lumding, Spanning Approximately 181 Km. ๐บ๏ธ ๐ The Scope Of Work Includes Geo Technical Investigation, Preparation Of The Engineering, Investment, And Financial Report (Eirr), And Submission Of The Detailed Project Report (Dpr) In Accordance With The Railway Board's Latest Guidelines. ๐ Bid Submission Deadline: May 10, 2024, 2:30 Pm Tender Fee: Inr 0 Emd: Inr 2,94,800 Interested Firms Must Possess The Requisite Expertise And Experience In Railway Projects To Qualify For This Tender. Detailed Proposals, Including Methodologies And Compliance With The Tender Specifications, Are To Be Submitted By The Stipulated Deadline. Keywords: Final Location Survey, Railway, Guwahati Lumding, Geo Technical Investigation, Eirr, Dpr, Ministry Of Railways, Tender, ProcurementParticulars | Details |
---|---|
Title |
Final Location Survey For 3rd Line Between Guwahati Lumding (App. Length =181.00 Km) With Geo Technical Investigation, Preparing Eirr &Amp Submission Of Dpr As Per Railway Board S Latest Guide Lines Complete In All Respect.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74609482 |
Reference Number |
CE-CON-SUR-FLS-2024-03 |
Tender Fee | 0 |
EMD | 2.95 Lakh |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74609482/viewNitPdf_4536566.pdf |
Start Date | April 13, 2024 00:32 |
End Date |
10/05/2024 ( Expired 371 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying out final location survey including preparation of dpr, geotechnical investigation, signaling works, electrical works & operating work for new bg railway line projects, doubling/ third line/ 3rd & 4thline/flyover, road over bridges, under the jurisdiction of chief administrative officer (const)-ahmedabad of western railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including eletrical, trd and s&t for : (a) pirpainti by-pass line connectin
For complete deion and other details, please refer to tender
Read moreConducting final location survey with hybrid modern survey technology using dgps integrated rtk/ppk uas drone (npnt compliant from dgca) based photogrammetric and lidar system, conducting soil investigation & preparation and submission of various detailed drawings and preparation of estimate and dpr of new line between gadchiroli to bacheli via bijapur (490.0km) section of south east central railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey including preparation of dpr as per latest railway board guidelines, involving modern survey techniques e.g. airborne or terrestrial lidar and/or drone photogrammetry for linear projects of railways. geotechnical investigation, signalling works, electrical works & operating work for construction of 4th line/ flyover line/ byepass line (1) khana-sainthia 4th line (84.10km). (ii) masagram flyover (5 km). (iii) katwa by-pass connecting bardhanman-katwa single
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including electrical, trd and s&t for jasidih - dumka double line (71.58 km
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including eletrical, trd and s&t for : (a) pirpainti by-pass line connectin
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including electrical, trd and s&t for sitarampur-jhajha 4th line (153.89km
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including eletrical, trd and s&t for andal-sitarampur 6th line ( 34.00 km )
For complete deion and other details, please refer to tender
Read moreConducting final location survey with hybrid modern survey technology using dgps integrated rtk/ppk uas drone (npnt compliant from dgca) based photogrammetric and lidar system, conducting soil investigation & preparation and submission of various detailed drawings and preparation of estimate and dpr of 4th line between gondia - nagpur (134.00km) section & left out sections of 4th line between bilaspur - gondia of south east central railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of (i) flyover between uslapur - dadhapara (17.875 km) (ii) flyover anuppur(9.20 km), (iii) 3rd & 4th line between champa-gevra road (92 km) & (iv) new double line connecting tallaipalli mines & gare pelma mines along with y form connectivity with gharghoda - bhalumuda line &
For complete deion and other details, please refer to tender
Read moreof your Industry type