Tender Details
Particulars | Details |
---|---|
Title |
Conducting Of Soil Investigation By Way Of Spt And Plate Load Test As Prescribed In The Tender Document And Submission Of Geo Technical Investigation Report Complete In All Respect. Preparation Of Site Plan/Contouring Geo Technical Investigation Soil
|
Description |
Conducting Of Soil Investigation By Way Of Spt And Plate Load Test As Prescribed In The Tender Document And Submission Of Geo Technical Investigation Report Complete In All Respect. Preparation Of Site Plan/Contouring Geo Technical Investigation Soil
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHE_265502_1 |
Reference Number |
e-NIT No. 36 of 2024-25 consultants |
Tender Fee | 1000 |
EMD | 36000 |
Tender Value | |
Place | udhampur town |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=812986 |
Start Date | November 22, 2024 15:30 |
End Date |
03/12/2024 ( Expired 140 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for preparation submission and approval of mining plan as per scope of work
Preparation submission and approval of mining plan in respect of lime stone quarry khrew as per scope of work
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Read morePreparation of safety report crisis management plan and disaster management plan updation of on site emergency plan off site emergency plan and its validationapproval from directorate of industrial health and safety govt of mp indore in respect sgtps
Preparation of safety report crisis management plan and disaster management plan updation of on site emergency plan off site emergency plan and its validationapproval from directorate of industrial health and safety govt of mp indore in respect sgtps
Read moreStrenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Read morePreparation and supply of three dimenstional model of raw water rising main, intake sturcture and other buildings as per design and specification with lighting arrangment complete in all respect as per e.i.c at alipurduar division, phe dte.
Preparation and supply of three dimenstional model of raw water rising main, intake sturcture and other buildings as per design and specification with lighting arrangment complete in all respect as per e.i.c at alipurduar division, phe dte.
Read moreShifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read morePreparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Read moreAppointment of technical consultant for preparation of gad, feasibility report, soil investigation report and dpr for proposed high level bridge at patiala feeder crossing khanna-malerkotla road (mdr-33) at rd 23.00 km (near jourepul) in distt. ldh.
Appointment of technical consultant for preparation of gad, feasibility report, soil investigation report and dpr for proposed high level bridge at patiala feeder crossing khanna-malerkotla road (mdr-33) at rd 23.00 km (near jourepul) in distt.ldh
Read moreQuantifying silt deposited and assessment of storage capacity in upper aliyar dam located in coimbatore district by conducting bathymetry survey using appropriate technology and preparation of land plan schedule
Quantifying silt deposited and assessment of storage capacity in upper aliyar dam located in coimbatore district by conducting bathymetry survey using appropriate technology and preparation of land plan schedule
Read moreLaboratory cbr test and atterbergs limits including collection of soil samples from the site and preparation and submission of detailed report
Laboratory cbr test and atterbergs limits including collection of soil samples from the site and preparation and submission of detailed report
Read moreof your Industry type