Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Slope Protection And Nallah Treatment Project 🌱🚧 The Dte General Border Roads Organisation, Under The Central Government, Invites Bids From Experienced Contractors For The Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 On The Basholi Bani Bhaderwah Road, Under The 69 Rcc/35 Brtf Project Sampark, To Be Executed In Epc Mode. 📅 Bid Submission Deadline: April 13, 2024, 12:00 Pm Tender Fee: Inr 11,800 Emd: Inr 25,42,000 Interested Bidders Must Possess The Requisite Expertise And Experience In Similar Infrastructure Projects. Detailed Proposals, Including Design Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Project's Requirements And The Tender Documents. Keywords: Border Roads Organisation, Slope Protection, Nallah Treatment, Infrastructure Project, Epc Mode, Project Sampark, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode
|
| Description |
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_BRO_645961_1 |
|
Reference Number |
CE(P) SPK/EPC/07/2023-24 |
| Tender Fee | 11800 |
| EMD | 25.42 Lakh |
| Tender Value | - |
| Place | Km 46.00 on Bhasoli-Bani-Bhaderwah Road |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=723216 |
| Start Date | March 20, 2024 19:30 |
| End Date |
Expired
13/04/2024
Expired 914 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Investigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)
Investigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)
Read moreMaint basholi-bani-bhaderwah stone boulder for part i,maint basholi-bani-bhaderwah stone metal 40 m
Read more
Design and construction of 120 m long (2 spans of 60 m each) major pmt psc box girder bridge (open fdn for abutments and well fdn for pier) including ssi over sukha nallah at km 46.00 on road basoli-bani-bhadarwah under 69rcc/13brtf/project sampark
Design and construction of 120 m long (2 spans of 60 m each) major pmt psc box girder bridge (open fdn for abutments and well fdn for pier) including ssi over sukha nallah at km 46.00 on road basoli-bani-bhadarwah under 69rcc/13brtf/project sampark
Read moreSlope stabilisation and land slide protection structure at km 46.00 on balipara charduar tawang road under 91 rcc/ 14 brtf/ project vartak in the state of arunachal pradesh
Slope stabilisation and land slide protection structure at km 46.00 on balipara charduar tawang road under 91 rcc/ 14 brtf/ project vartak in the state of arunachal pradesh
Read moreSlope stabilisation and land slide protection structure at km 46.00 on balipara charduar tawang road under 91 rcc/ 14 brtf/ project vartak in the state of arunachal pradesh
Slope stabilisation and land slide protection structure at km 46.00 on balipara charduar tawang road under 91 rcc/ 14 brtf/ project vartak in the state of arunachal pradesh
Read moreExecution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Execution slope ptrotection and retention measures at km 44.500, km 50.000 and km 60.400 on rd h-s-h (huri axis) including geological investigation, preparation of design from iit under 85 rcc/ 756 brtf under project ank in kurung kumey dist of ap
Read moreDesign and construction of 50mtr span major pmt br steel girder through type with rcc decking on open foundation over kaban nallah at km 44.400 on rd galhar-sansari 118 rcc 35 brtf pjt sampark in jk
Design and construction of 50mtr span major pmt br steel girder through type with rcc decking on open foundation over kaban nallah at km 44.400 on rd galhar-sansari 118 rcc 35 brtf pjt sampark in jk
Read moreImpvt to khab namgia chuppan rd with nallah treatment and avalanche prtctn measures incl design and drg proof checked by iit at km 16 pt 200 near habsar br under 68 rcc 759 brtf rd of project deepak in hp
Impvt to khab namgia chuppan rd with nallah treatment and avalanche prtctn measures incl design and drg proof checked by iit at km 16 pt 200 near habsar br under 68 rcc 759 brtf rd of project deepak in hp
Read moreInvestigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc
Investigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc
Read moreDesign and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut
Read moreof your Industry type