Tender Details

Particulars Details
Title
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode (2 Nd Call)
Description
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode (2 Nd Call)
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2024_BRO_672554_1
Reference
Number
CE (P) SPK/EPC/02/2024-25
Tender Fee 11800
EMD 25.42 Lakh
Tender Value
Place Km 46.000 on Basoli Bani Bhaderwah Road
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=751926
Start Date September 14, 2024 19:30
End Date

08/10/2024 ( Expired 194 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call

Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call

Read more
Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call

Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call

Read more
Design and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode

Design and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode

Read more
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(2nd call)

Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(2nd call)

Read more
Construction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project

Construction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project

Read more
Sub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.

Sub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.

Read more
Investigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc

Investigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc

Read more
Investigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)

Investigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)

Read more
2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode

2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode

Read more
Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Execution of hybrid reinforced earth walls at km 13.500, km 35.400, km 35.500 and km 36.680 on lee huri rd including preparation of design and its proof check from iit under 119 rcc /756 tf under p ank of a.p through epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise