Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode (2 Nd Call)
|
Description |
Investigation Design And Construction Of Slope Protection And Nallah Treatment Measures At Km 46.00 Sukha Nallah Along Basholi Bani Bhaderwah Road Under 69 Rcc/ 35 Brtf Project Sampark Through Epc Mode (2 Nd Call)
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2024_BRO_672554_1 |
Reference Number |
CE (P) SPK/EPC/02/2024-25 |
Tender Fee | 11800 |
EMD | 25.42 Lakh |
Tender Value | |
Place | Km 46.000 on Basoli Bani Bhaderwah Road |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=751926 |
Start Date | September 14, 2024 19:30 |
End Date |
08/10/2024 ( Expired 266 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreProvid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Provid, lay, spreading and compaction dbm 50 mm thick, bc 40 mm thick (all compacted thickness), prime coat and tack coat as per morth specification at 2.500 km from katra (net length 1.100 km) under 69 rcc/35 brtf/project sampark in jk 2nd call
Read moreProv,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call
Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call
Read moreDesign and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode
Design and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(2nd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(2nd call)
Read moreConstruction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Construction improvement of rishi rongli kupup road from cl 9 to nhdl specifications through epc mode between existing km 53.00 design km 55.440 to existing km 70.00 design km 74.575 net design length 19.135 km under 130 rcc 764 brtf under project
Read moreSub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.
Sub soil investigation, design, drg and constr of 80 m span major pmt shere thapa bridge over ismi-siko nallah including approach roads at km 0.630 on road tcc-maza through epc mode under 128 rcc / 23 brtf/project arunank in arunachal pradesh.
Read moreInvestigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc
Investigation design and cnstrn of slope stabilization and rockfall protection measures on approaches to 60 m span mjr pmt steel girder bridge with rcc decking on open foundation over mitalgarh nallah at km 0.022 on galhar-sansari road 118rcc
Read moreInvestigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)
Investigation design and construction of slope protection and nallah treatment measures at km 46.00 sukha nallah along basholi-bani-bhaderwah road under 69 rcc/ 35 brtf project sampark through epc mode (2nd call)
Read moreof your Industry type