Tender Details

Particulars Details
Title
Construction Of Drain From Raju Saini House To Ramawtar Saini House, Goyanka Kua To Panda Chakki To Ramgarh Road And Nahar Ji House To Ramgarh Road, Ward No. 22, 24,25
Description
Construction Of Drain From Raju Saini House To Ramawtar Saini House, Goyanka Kua To Panda Chakki To Ramgarh Road And Nahar Ji House To Ramgarh Road, Ward No. 22, 24,25
Organisation Government of Rajasthan
Tender Id 2023_DLB_358508_3
Reference
Number
1424/14-08-2023/NPMANDAWA
Tender Fee 500
EMD 49940
Tender Value
Place MUNICIPAL BOARD MANDAWA
Link https://eproc.rajasthan.gov.in
Start Date August 16, 2023 14:30
End Date

25/08/2023 ( Expired 674 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of cc road from shiv mandir towards shakti shrivastav ji house, ganeshpuri, neelbad , ward26, zone 21

Construction of cc road from shiv mandir towards shakti shrivastav ji house, ganeshpuri, neelbad , ward26, zone 21

Read more
Asphlting of road from behind putlighar zafar kirana shop to rashid bhai briyani shop in ward no.09, zone no.05

Asphlting of road from behind putlighar zafar kirana shop to rashid bhai briyani shop in ward no.09, zone no.05

Read more
Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase

Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase

Read more
Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise