Tender Details

Particulars Details
Title
Construction Of Santoshgarh Mehatpur Road Km.0.0 To 7.0 (Sh C O U Shape Drain Retaining Wall And Rcc Slab Over Drain In Rd.4.250 To 4.400) Under Otmnp
Description
Construction Of Santoshgarh Mehatpur Road Km.0.0 To 7.0 (Sh C O U Shape Drain Retaining Wall And Rcc Slab Over Drain In Rd.4.250 To 4.400) Under Otmnp
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_99955_1
Reference
Number
Job 03 C/O Santoshgarh Mehatpur road
Tender Fee 350
EMD 13400
Tender Value
Place Una
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=147026
Start Date February 14, 2025 20:30
End Date

20/02/2025 ( Expired 110 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Read more
Construction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat

Construction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat

Read more
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.

Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.

Read more
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section

Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section

Read more
Construction of cc drain and rcc culvert at railpeta 1st line 1st cross road to 2nd line 2nd cross road east side and providing cc road at railpeta 1st line 1st cross road in div no.06 under ae-10 section llr

Construction of cc drain and rcc culvert at railpeta 1st line 1st cross road to 2nd line 2nd cross road east side and providing cc road at railpeta 1st line 1st cross road in div no.06 under ae-10 section llr

Read more
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Read more
Construction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur

Construction of rcc covered drain in lieu of brick drain near sports complex of hq mb area and provn of rcc retaining wall and box type culvert at approach road of children school at manekshaw enclave in the area of age b/r-i under ge (west) jabalpur

Read more
Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii

Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii

Read more
Construction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii

Construction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise