Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Link Road From Jhalera Bridge To Una Via Lower Lalsingi Km.0.0 To 4.340(sh C.O U Shape Drain At Rd.3.100 To 3.600(right Side)(Under Otmnp)
|
Description |
Construction Of Link Road From Jhalera Bridge To Una Via Lower Lalsingi Km.0.0 To 4.340(sh C.O U Shape Drain At Rd.3.100 To 3.600(right Side)(Under Otmnp)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_97976_1 |
Reference Number |
Job 01 C/O L/R from Jhalera bridge to Una |
Tender Fee | 2000 |
EMD | 1.14 Lakh |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=143781 |
Start Date | January 14, 2025 22:30 |
End Date |
20/01/2025 ( Expired 137 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of road from laxmipur to panja via bhatin within kashipur block in the district of purulia under nabard ridf -xxxi, road length- 4.800 km.
Construction of road from laxmipur to panja via bhatin within kashipur block in the district of purulia under nabard ridf -xxxi, road length- 4.800 km.
Read moreConstruction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Read moreConstruction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreAAAAAAAAAA
Login to viewConstruction of cement concrete road and surface drain and sidewall from h/o allauddin mondal to jhafar ali mondal via h/o rafiq mallick to h/o aresh hazi mallick.....baharuddin to h/o sk jahar ali in ward no-04 under dankuni municipality
Read moreConstruction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii
Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii
Read moreof your Industry type