Tender Details
Particulars | Details |
---|---|
Title |
Material Supply For All Type Construction Work And Electric Water Supply Material For Year 2025 26 (Under All Fund)
|
Description |
Material Supply For All Type Construction Work And Electric Water Supply Material For Year 2025 26 (Under All Fund)
|
Organisation | RDD-CEO-BHANDARA | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 0 |
Tender Value | |
Place | GRAMPANCHAYAT SONULI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 16:30 |
End Date |
12/05/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreConstruction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Construction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreFor supply installation including civil work and commissioning of 100kva d.g set
For supply installation including civil work and commissioning of 100kva d.g set
Read moreSupply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc
Supply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc.
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreof your Industry type