Tender Details

Particulars Details
Title
Wbpwd/Ee/Asndvn/E Niq12/2023 24
Description
Carrying Out Falling Weight Deflectometer (Fwd) Test And Other Necessary Field Works And Calculations For Preparation Of Comprehensive Detailed Project Report For The Strengthening Of Asansol Court Road From Ch. 0.000 Kmp To Ch. 1.800 Km In Th.......
Organisation PWD | State Govt. and UT
Tender Id 2023_PWD_631180_2
Reference
Number
Tender Fee 0
EMD 3000
Tender Value 0
Place asansol
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1351633
Start Date December 29, 2023 16:30
End Date

11/01/2024 ( Expired 504 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.

Preparation of detailed project report (dpr)for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.

Read more
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under u.d. division, p.w.d.(2nd call)

Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under u.d. division, p.w.d.(2nd call)

Read more
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj

Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj

Read more
Consultancy services for carrying out feasibility study and preparation of detailed project report for construction improvement of road baripattan jhallas from km 103.700 to 210.00 in 31 brtf area under project sampark in j k

Consultancy services for carrying out feasibility study and preparation of detailed project report for construction improvement of road baripattan jhallas from km 103.700 to 210.00 in 31 brtf area under project sampark in j k

Read more
Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.

Preparation of detailed project report (dpr) for the work widening, strengthening and protection of raiganj-kaliyaganj-buniadpur road (sh-10), ch. from 4.60 km. to 22.725 km. and ch. from 27.925 km. to 35.00 km under uttar dinajpur division, p.w.d.

Read more
Consultancy services for carrying out feasibility study, preparation of detailed project report for geological investigation of slope stabilisation/slope mitigation between km 1.900 to km 8.780, km 27.00 to km 27.150 and km 35.500 to km 35.650 on san

Consultancy services for carrying out feasibility study, preparation of detailed project report for geological investigation of slope stabilisation/slope mitigation between km 1.900 to km 8.780, km 27.00 to km 27.150 and km 35.500 to km 35.650 on san

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under35tf/spk

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.35 to km 90.150) (pkg-iv) d in jk (ut)under35 tf/spk

Read more
Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md.bazar road from 0kmp to 5.60 kmp under birbhum division pwd 2ndcall

Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md.bazar road from 0kmp to 5.60 kmp under birbhum division pwd 2ndcall

Read more
Preparation of ppt details project report,fwd test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with widening and strengthening of malda bulbulchandi road

Preparation of ppt details project report,fwd test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with widening and strengthening of malda bulbulchandi road

Read more
Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md. bazar road from 0.00 kmp to 5.600 kmp under birbhum division, pwd

Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md. bazar road from 0.00 kmp to 5.600 kmp under birbhum division, pwd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise