Tender Details
Particulars | Details |
---|---|
Title |
3rd Party Monitoring And Quality Control For The Work Imp And Up Gradation Of Road Of From Akajan Lakabali Road Ing At Pmgsy Pkg No As04 304 Via Mes Gainadi To Nilakh Including Const Of Rcc Bridge Over River Gainadi Under Crif
|
Description |
3rd Party Monitoring And Quality Control For The Work Imp And Up Gradation Of Road Of From Akajan Lakabali Road Ing At Pmgsy Pkg No As04 304 Via Mes Gainadi To Nilakh Including Const Of Rcc Bridge Over River Gainadi Under Crif
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2025_PWD_43893_1 |
Reference Number |
JTRD/Bridge/pt-I/2021-22/3723 Dated 21st March 2025 |
Tender Fee | 14209 |
EMD | 94727 |
Tender Value | |
Place | SARUPAM |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=69841 |
Start Date | April 01, 2025 00:25 |
End Date |
16/04/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Constn of hl bridge skew span 12m each eff over lisara drain crossing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5 m high rcc ret wall pmgsy iii pak no pb02_048
Constn of hl bridge skew span 12m each eff over lisara drain crossing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5 m high rcc ret wall pmgsy iii pak no pb02_048
Read moreConst of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan to nathana via seema poohli at rd 8.70 km inc appr road diversion dismantling 2.5 m high rcc retaining wall etc pmgsyiii batch i pac no pb02 047
Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan
 to nathana via seema poohli at rd 8.70 km inc appr. road diversion dismantling and 2.5 m high rcc retaining wall etc pmgsyiii batch-i pac no pb-02 047 
Read moreConstruction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di
Construction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di
Read moreConst. of hl bridge 4 spans 9.4 mtr., 14.13 mtr., 14.13 mtr., and 9.4 mtr. each eff. over sirhind choe x-ing jakhepalbas to hero khurd road including approaches, road di, dismantling in distt. sangrur under pmgsy_iii (batch_i) pb_17319
Const. of hl bridge 4 spans 9.4 mtr., 14.13 mtr., 14.13 mtr., and 9.4 mtr. each eff. over sirhind choe x-ing jakhepalbas to hero khurd road including approaches, road di, dismantling in distt. sangrur under pmgsy_iii (batch_i) pb_17319
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreC/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
C/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
Read more- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road
Read moreConstruction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Construction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Read moreUp gradation of rural road from garacharma junction to sippighat via teylerabad and bimblitan under pmgsy-iii batch-i, 2024-25.
Up gradation of rural road from garacharma junction to sippighat via teylerabad and bimblitan under pmgsy-iii batch-i, 2024-25.
Read moreof your Industry type