Tender Details
Particulars | Details |
---|---|
Title |
Pvip Providing Support With Sand Bags To Pipe Temporarily Installed By Alangad Panchayath At Ch. 1.50 Km Of Varappuzha Sbc
|
Description |
Providing And Fixing Temporary Support For Rcc Hume Using Gi Pipe
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_656241_1 |
Reference Number |
IRR/PII/TR/378/2024_5_1_1/1 |
Tender Fee | 555 |
EMD | 5109 |
Tender Value | |
Place | Aluva |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1013245 |
Start Date | February 08, 2024 18:30 |
End Date |
15/02/2024 ( Expired 460 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Fdr / mtc. of road from natun bazar tehsil office to hanging bridge via madhan mohan ashram at ch. 0.00 km to 0.70 km (l- 700.00 mtr ) under jatanbari pwd(randb) sub-division / sh- throughout re-carpeting (l-0.700 km) , sand seal coating, wbm gr-3
Read moreProviding and erecting w metal crash barrier at different location of t.k road in between ch 0.00 to 17.00 km and pendars area at khep, koteshwar
Providing and erecting w metal 
 crash barrier at different location of t.k road in between ch 0.00 to 17.00 km and pendars area at 
 khep, koteshwar
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Engagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Read moreUrmodi irrigation project pipe distribution network will be done by pipe pushing method at 11 places where the distribution system pipe line intersects the satara pandharpur national highway (nh 548-c) from km. 0 to 31 of man canal
Urmodi irrigation project pipe distribution network will be done by pipe pushing method at 11 places where the distribution system pipe line intersects the satara pandharpur national highway (nh 548-c) from km. 0 to 31 of man canal
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Read moreRepair renovation to ac plant by way of fabrication of aluminum cabin 19x19x10 for operators working in ac plant and covering from front side of ac plant by way of providing and fitting of aluminum frame with double door of size at ac plan
Repair renovation to ac plant by way of fabrication of aluminum cabin 19x19x10 for operators working in ac plant and covering from front side of ac plant by way of providing and fitting of aluminum frame with double door of size at ac plan
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector from km 114.000 to 123.000 (at different stretches) on baijnath-munsiyari road and tack coat with bitumen emulsi
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector from km 114.000 to 123.000 (at different stretches) on baijnath-munsiyari road and tack coat with bitumen emulsi
Read moreof your Industry type