Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mask, Half Face Mask Made Up Of Polyrecine And Elastoplastic Mix With Dual Cartridge Clamp And Rubb
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6004746 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 28, 2025 13:28 |
End Date |
15/03/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | BANGALORE INDUSTRIAL AIDS | Make : 3M Model : 3M HF–802SD Filtering Half Mask-Air Pollution Mask Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 08-03-2025 16:18:16 | MII | Disqualified |
2 | INNOVATIVE ENGINEERING PRODUCTS PRIVATE LIMITED | Make : 3M Model : 3M HF 802 Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 15-03-2025 10:54:42 | MII | Qualified |
3 | NEW INDIA LEATHER WORKS | Make : 3 M Model : 3 M 802 SD HFM ( ONLY MASK ) Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 08-03-2025 17:08:13 | MII | Qualified |
4 | SANDEEP ENTERPRISES | Make : 3M Model : HF802 SD Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 13-03-2025 18:13:03 | MII | Qualified |
5 | TECHNOCUT SOLUTIONS | Make : 3M Model : HF-802SD HALF FACE MASK MED, 1 Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 14-03-2025 13:18:07 | MII | Qualified |
6 | UTKAL INDUSTRIAL AND SAFETY PRODUCTS | Make : 3M Model : HALF FACE MASK HF-802SD Title : Mask, Half face mask made up of polyrecine and elastoplastic mix with dual cartridge clamp and rubbe | 14-03-2025 14:52:59 | MII | Qualified |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreJp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreTender for empanelment of sequencing based test laboratories (for genetic tests for study of mutation analysis of alpha and beta thalassemia along with polymorphism assay of secondary modifiers-xmn, bcl,11a hsb 1l myb klf 1 for a period of one y
Tender for empanelment of sequencing based test laboratories (for genetic tests for study of mutation analysis of alpha and beta thalassemia along with polymorphism assay of secondary modifiers-(xmn, bcl,11a, hsb 1l-myb, klf-1)) for a period of one y
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreJp/b862-000-pf-t-4350/1018 - compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Compressed air and cryogenic nitrogen plant package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreJp/b862-102-lz-mr-4040/513 - bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Read moreof your Industry type