Tender Details

Particulars Details
Title
Utility Shifting And S&Amp T Work In Connection With The Work Of (1) Construction Of Subway For Trespassing Location Nearby Closed Lc No. 477 In Agra Dholpur Section &Amp (2) Construction Subway In Lieu Of Lc No. 494 At Km 1341/11 13 In Agra Dholpur Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79599852
Reference
Number
AGRA-ST-GS-2025-01
Tender Fee 0
EMD 2 Lakh
Tender Value
Place Allahabad
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79599852/viewNitPdf_4836948.pdf
Start Date January 17, 2025 03:29
End Date

10/02/2025 ( Expired 92 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of remaining work rob in lieu lc no. 265 (railway km. 301.024) on sikar-jhunjhunu-luharu road (excluding cost of cement).

Construction of remaining work rob in lieu lc no. 265 (railway km. 301.024) on sikar-jhunjhunu-luharu road (excluding cost of cement).

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more
Shifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates

Shifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates in between khetia and balgona station at burdwan katwa rail line under purba bardhaman district

Read more
Construction work of cc road from deepu kasaudhan s shop to sunil yadav s house in ward no. 13 (dulladih) of nagar panchayat badhni chafa

Construction work of cc road from deepu kasaudhan s shop to sunil yadav s house in ward no. 13 (dulladih) of nagar panchayat badhni chafa

Read more
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.

Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise