Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 2000 Gpm/160 Mtr Pump Along With 8 Inch Dia Pipeline From Coal Face To 9 Seam Sump Of Abocp Mine, Block Ii Area
|
| Description |
Shifting Of 2000 Gpm/160 Mtr Pump Along With 8 Inch Dia Pipeline From Coal Face To 9 Seam Sump Of Abocp Mine, Block Ii Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_299954_1 |
|
Reference Number |
GM/B-II/AM (ENM)/E-TENDER/2023-24/293 dt 30.01.24 |
| Tender Fee | 0 |
| EMD | 1300 |
| Tender Value | - |
| Place | ABOCP Mine, Block-II Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310707 |
| Start Date | January 31, 2024 14:30 |
| End Date |
Expired
10/02/2024
Expired 978 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read more48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying
48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying
Read moreShifting of 8in dia pipeline and installation of 2000gpm pump at 9 seam under abocp mine block-ii area
Shifting of 8in dia pipeline and installation of 2000gpm pump at 9 seam under abocp mine block-ii area
Read moreShifting 4000gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Shifting 4000gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Read moreShifting of 2000gpm pump along with 10in/8in dia pipeline deco coal face of abocp mine block-ii area
Shifting of 2000gpm pump along with 10in/8in dia pipeline deco coal face of abocp mine block-ii area
Read moreShifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Shifting 4000 gpm and 2000gpm pump west coal face sump with delivery di as per installation place at 1t coal face under abocp mine
Read moreShifting of 2000gpm pump along with 10/8 inch dia pipeline from deco coal face to box cut -iii sump of abocp mine block-ii area.
Shifting of 2000gpm pump along with 10/8 inch dia pipeline from deco coal face to box cut -iii sump of abocp mine block-ii area.
Read more2000gpm pump middle coal face and east coal face for shifting and delivery installation as per new face position under abocp mine block-ii area
2000gpm pump middle coal face and east coal face for shifting and delivery installation as per new face position under abocp mine block-ii area
Read moreShifting at 2000gpm pump along with 8in dia m.s. pipe line in 9 seam of abocp mine under block-ii area
Shifting at 2000gpm pump along with 8in dia m.s. pipe line in 9 seam of abocp mine under block-ii area
Read moreShifting of 4000gpm, 2000gpm and 3200gpm pump along with delevery at 1t coal face for mine water dewatring under abocp mine block-ll area
Shifting of 4000gpm, 2000gpm and 3200gpm pump along with delevery at 1t coal face for mine water dewatring under abocp mine block-ll area
Read moreof your Industry type