Tender Details

Particulars Details
Title
Upgradation Of Pm Shree Upgraded Plus 2 High School, Sarauni, Sadar, Hazaribag, Jharkhand
Description
Upgradation Of Pm Shree Upgraded Plus 2 High School, Sarauni, Sadar, Hazaribag, Jharkhand
Organisation Zila Parishad Hazaribagh | State Govt. and UT
Tender Id 2025_ZPHZB_99958_1
Reference
Number
ZP/HZB/44/2024-25
Tender Fee 10000
EMD 5.2 Lakh
Tender Value
Place Sadar
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=134293
Start Date April 04, 2025 14:30
End Date

18/04/2025 ( Expired 79 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Augmentation to 11 kv ht 4 pole, 2 pole system for upgradation of external electric system at mil stn clement town

Augmentation to 11 kv ht 4 pole, 2 pole system for&#x0d upgradation of external electric system at mil stn&#x0d clement town

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune

8707 special repair to roof leakage of block 1 cl 2 3 and block 2 cl 5 6 of kv school provn of chain link fencing on boundary wall at vikram batra enclave provn of stone grill spl rep to bldg no t34 servant qtr under br i and brii em ii ges pune

Read more
Part 1. yard development of dock i east kpd including repair, modification, upgradation of existing drainage system, kp docks. part 2. yard development of dock ii, kpd including repair, modification, upgradation of existing drainage system, kp docks.

Part 1. yard development of dock i east kpd including repair, modification, upgradation of existing drainage system, kp docks. part 2. yard development of dock ii, kpd including repair, modification, upgradation of existing drainage system, kp docks.

Read more
Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07

Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07

Read more
Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) chabbewal constituency (one year defect liability period plus 4 years maintenance of road) group no. 2

Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) chabbewal constituency (one year defect liability period plus 4 years maintenance of road) group no. 2

Read more
Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) shamchurasi constituency (one year defect liability period plus 4 years maintenance of road) group no. 3

Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) shamchurasi constituency (one year defect liability period plus 4 years maintenance of road) group no. 3

Read more
Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) hoshiarpur constituency (one year defect liability period plus 4 years maintenance of road) group no. 2

Special repair of link roads under repair programme 2022-23,2023-24 and 2024-25 (upgradation under nida project) hoshiarpur constituency (one year defect liability period plus 4 years maintenance of road) group no. 2

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise