Tender Details
Particulars | Details |
---|---|
Title |
Preparation Of Detailed Project Report Design Of Sewer Network In Aravali Vihar Phase I / Ii And Ambedkar Nagar Block M And N And Construction Of Nallah (Drainage System)
|
Description |
Preparation Of Detailed Project Report Design Of Sewer Network In Aravali Vihar Phase I / Ii And Ambedkar Nagar Block M And N And Construction Of Nallah (Drainage System)
|
Organisation | UIT -Alwar-Secretary | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 20000 |
Tender Value | |
Place | UIT ALWAR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 08, 2025 14:30 |
End Date |
30/04/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreDesign and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Design and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreConstruction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase - 3rd call
Construction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase&#x0d - 3rd call&#x0d
Read moreConsultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway
Consultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway of bhavnagar bharuch in the state of gujarat
Read moreConstruction of cc road and drain and cc tiles patri from sambhav hospital to l.i.c colony and munshi nagar phase-2 in chhoti vihar ward-10.
Construction of cc road and drain and cc tiles patri from sambhav hospital to l.i.c colony and munshi nagar phase-2 in chhoti vihar ward-10.
Read moreConsultancy services for preparation of detailed project report and pre-construction activities for construction of seven tunnels of 60 m length each at three different locations, in the union territory of ladakh
Consultancy services for preparation of detailed project report and pre-construction activities for construction of seven tunnels of 60 m length each at three different locations, in the union territory of ladakh
Read moreDesign of construction of nallah and drainage system in 200 feet bypass, tijara road (in front of shalimar) and delhi road, alwar.
Design of construction of nallah and drainage system in 200 feet bypass, tijara road (in front of shalimar) and delhi road, alwar.&#x0d &#x0d
Read morePreparation of detailed project report design of sewer network in aravali vihar phase i / ii and ambedkar nagar block m and n and construction of nallah (drainage system)
Preparation of detailed project report design of sewer network in aravali vihar phase i / ii and ambedkar nagar block m and n and construction of nallah (drainage system)
Read moreof your Industry type