Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Dormitory At Idamalayar Hep
|
| Description |
Idamalayar Hep Renovation Of Dormitory At Idamalayar Re Tender
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2025_KSEB_746707_2 |
|
Reference Number |
GDI/44/2024-25 dated 05.03.2025 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | - |
| Place | Idamalayar Hydro Electric Project Colony |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1244050 |
| Start Date | May 10, 2025 16:30 |
| End Date |
Expired
20/05/2025
Expired 499 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreIdamalayar hep jungle clearing and related works at idamalayar colony
Idamalayar hep jungle clearance and related works in the idamalayar colony and power house compound for the period april 2024 to march 2025
Read moreIdamalayar hep renovation of power house wiring and electrification
Idamalayar hep renovation of power house wiring and electrification
Read moreIdamalayar hep epoxy flooring at service bay in idamalayar power house
Idamalayar hep epoxy flooring at service bay in idamalayar power house
Read moreIdamalayar hep construction of new toilets in idamalayar power station and renovation of operators cabin at valve house
Idamalayar hep construction of new toilets in idamalayar power station and renovation of operators cabin at valve house
Read morePainting of penstock pipe lines at idamalayar hep
Idamalayar hep scrapping cleaning and painting of unit 1 and 2 penstock pipe lines at idamalayar power house
Read moreof your Industry type