Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Work With General Repair Of Matkhas Urf Purwa Link Road Length 0.50 Km
|
| Description |
Renewal Work With General Repair Of Matkhas Urf Purwa Link Road&Amp#X0d
Length 0.50 Km&Amp#X0d
|
| Organisation | Chief Engineer Gorakhpur Zone PWD Gorakhpur UP | State Govt. and UT |
| Tender Id | 2024_CEGKP_886131_14 |
|
Reference Number |
115/1A Dated 16-01-2024 |
| Tender Fee | 856 |
| EMD | 55000 |
| Tender Value | |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1518185 |
| Start Date | January 27, 2024 17:30 |
| End Date |
Expired
05/02/2024
Expired 892 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreGeneral repair and reconstruction of septic tank cover slab and allied works at chick sexing school livestock management training centre kudapanakunnu civil work general civil work
General repair and reconstruction of septic tank cover slab and allied works at&#x0d chick sexing school livestock management training centre kudapanakunnu civil work &#x0d general civil work &#x0d
Read moreDeposit-kerala state centre for advanced printing and training (c-apt)subcentre, alappuzhaurgent repair and maintenance of building-work-general electrical work
Deposit-kerala state centre for&#x0d advanced printing and training&#x0d (c-apt)subcentre, alappuzhaurgent&#x0d repair and maintenance&#x0d of building-work-general electrical work
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreRepair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Repair/maint of compound/bdy wall barbed wire chain link fencing area drainage and other misc work at 402 lt/ad bty and amn under ge (i) gos
Read moreLac-ads-govt. l p school ulavaip - construction of new school building-work- general electrical work
Lac-ads-govt. l p school ulavaip -&#x0d construction of new school building-work-&#x0d general electrical work
Read moreof your Industry type