Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stone Pitching Work At Green Corridor Phase 1 St From Prerna Shthal To Gaughat Bridge Toward Cattle Colony
|
| Description |
Stone Pitching Work At Green Corridor Phase 1 St From Prerna Shthal To Gaughat Bridge Toward Cattle Colony
|
| Organisation | Lucknow Development Authority | State Govt. and UT |
| Tender Id | 2025_LDAUP_1047697_1 |
|
Reference Number |
58/e-nivida/ce/25-26 |
| Tender Fee | 4366 |
| EMD | 3.45 Lakh |
| Tender Value | - |
| Place | CE LDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1903414 |
| Start Date | June 12, 2025 14:30 |
| End Date |
Expired
03/07/2025
Expired 470 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Basant kunj yojana antargat rashtriy prerna sthal ke lokarpan ki drishtigat green corridor ke slip road se 45 meter road wa prerna sthal ke aantrik chetra mein vartical garden evam topaeri lagaya jaane ewam anya avashyak karya
Basant kunj yojana antargat rashtriy prerna sthal ke lokarpan ki drishtigat green corridor ke slip road se 45 meter road wa prerna sthal ke aantrik chetra mein vartical garden evam topaeri lagaya jaane ewam anya avashyak karya
Read moreBasantkunj yojnaantargat green corridor par slip road se iim road tirahe k madhya rastra prerna esthal k uper bandhe k adyonic anurakshan ka karya for 1 year
Basantkunj yojnaantargat green corridor par slip road se iim road tirahe k madhya rastra prerna esthal k uper bandhe k adyonic anurakshan ka karya for 1 year
Read moreConstruction work of remaining trunk drain up to barrel located at cattle colony parallel to green corridor in basantkunj yojna sec-j
Construction work of remaining trunk drain up to barrel located at cattle colony parallel to green corridor in basantkunj yojna sec-j
Read moreRemoving and re-setting of reservoir side disturbed stone pitching between rd 100.00 ft. to rd 700.00 ft. of 1st gap of left dyke for the year 2024-25
Removing and re-setting of reservoir side disturbed stone pitching between rd 100.00 ft. to rd 700.00 ft. of 1st gap of left dyke for the year 2024-25
Read moreof your Industry type