Tender Details

Particulars Details
Title
Repairing And Fitting Of Damaged/Decayed Bucket Link Assly. 52 Of 800mm Width Of 207bucket Elevator Along With Lining Plate, Angle And Gear Box, Duplex Driving Chain Maint. And Replacement Of Damaged/Decayed Platform, Stair Case Arrangement
Description
Repairing And Fitting Of Damaged/Decayed Bucket Link Assly. 52 Of 800mm Width Of 207bucket Elevator Along With Lining Plate, Angle And Gear Box, Duplex Driving Chain Maint. And Replacement Of Damaged/Decayed Platform, Stair Case Arrangement
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_303521_1
Reference
Number
PO/KW/eTender/23-24/149, dated 01.03.2024
Tender Fee 0
EMD 6200
Tender Value
Place Kedla Washery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314398
Start Date March 04, 2024 15:30
End Date

14/03/2024 ( Expired 404 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repair of 02 no. feed cylinder mounting hole, pin making, material deposition in sliding system plate and base with grinding work of rotary gear box, rep. of feed chain sprocket and pin material filling, bush fitting and pin making of drill 1406

Repair of 02 no. feed cylinder mounting hole, pin making, material deposition in sliding system plate and base with grinding work of rotary gear box, rep. of feed chain sprocket and pin material filling, bush fitting and pin making of drill 1406

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.

Read more
Repairing of damaged tail end shaft assly and chain adjusting screw, repairing of wornout side liner and retaining plate of hopper,replacement of conveyor chain,dism. and fitting of flight assly with side plate repairing,i.r f/b no 2,phularitand.

Repairing of damaged tail end shaft assly and chain &#x0d adjusting screw, repairing of wornout side liner and &#x0d retaining plate of hopper,replacement of conveyor chain,dism. and fitting of flight assly with side plate repairing,i.r f/b no 2,phularitand.

Read more
Replacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304

Replacement of damaged decayed deck plate, channel, angle and top and bottom frame with idlers dismantling and reinstallation along with replacement of damaged tail base frame nondrive arrangement after tail snub pulley dismantling of unit no. 304

Read more
Overhauling of complete swing gear box assembly along with rack and pinion, repairing of damaged walkway, platform, handrails of stacker ii under chp/cpp, piparwar area.

Overhauling of complete swing gear box assembly along with rack and pinion, repairing of damaged walkway, platform, handrails of stacker ii under chp/cpp, piparwar area.

Read more
Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Read more
Repairing of oil cooler tube, front and rear jack, track chain roller, guard straightening, rotary gearbox and rep. of propel gear box driving sprocket shaft, rotary gear sliding side plate and seam, boom alignment of idm 30 drill 752.

Repairing of oil cooler tube, front and rear jack, track chain roller, guard straightening, rotary gearbox and rep. of propel gear box driving sprocket shaft, rotary gear sliding side plate and seam, boom alignment of idm 30 drill 752.

Read more
Replacement of damaged decayed bend pulley frame arrangement strengthening,supporting along with tail pulley adapter shaft changing, gear box maintenance, guide channel arrangement conveyor supporting post, top,bottom idler frame repairing 123bc

Replacement of damaged decayed bend pulley frame arrangement strengthening,supporting along with tail pulley adapter shaft changing, gear box maintenance, guide channel arrangement conveyor supporting post, top,bottom idler frame repairing 123bc

Read more
Complete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.

Complete repairing of 02sets of damaged and worn-out drive and driven chain sprocket and shaft assly. of 800mm bucket elevator main plant of kedla washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise