Tender Details

Particulars Details
Title
Hard Wooden Sleepers
Description
Organisation Department of Atomic Energy | PMO
Tender Id GEM/2024/R/402297
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date October 30, 2024 16:30
End Date
Expired 31/10/2024

Expired 710 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...

Tender Status: awarded
Buyer Name: Mandakini Shankar Bhange
Ministry: Pmo
Department: Department Of Atomic Energy
Organisation: Directorate Of Purchase And Stores

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
BPE 650VA BPE BPE 650VA 2 ₹ 3216.000
DLINK SWITCH 8 PORT D-Link DES-1008C 10/100 Mbps Unmanaged Switch Network Switch 6 ₹ 4974.000
RICOH Toner type 1230D Black RICOH RICOH Toner type 1230D Black 5 ₹ 21905.000
HP 12A Black Original LaserJet Toner Cartridge Q2612AC hp HP 12A Black Original LaserJet Toner Cartridge Q2612AC 10 ₹ 42650.000
FEVICOL SQUEEZY BOTTLE 200 gm Fevicol NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I 300 ₹ 20250.000
Luminous PC 18042 - 150AH Tubular Battery LUMINOUS Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty 1 ₹ 13850.000
Nanochecker 710 NANOCHECKER 710 Nanochecker 710 1 ₹ 349000.000
JK J K Jk Easy Copier 300 ₹ 48897.000
Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm LOTUS Lotus Eazy 96 PAGES 30 ₹ 1080.000
jungle boot direct moulded pu sole in pairs Sk SK 13 ₹ 4550.000
Samsungtonercartridge MLT-D101S SAMSUNG MLT-D101S 20 ₹ 35900.000
Notebook Computers-Laptop Lenovo Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs 5 ₹ 165000.000
Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g PHOENIX SMART-20 9 ₹ 31500.000
VIM SOAP Vim VIM SOAP 50 ₹ 1000.000
spectra FS paper Trident Paper FS spectra FS 75 gsm 100 ₹ 21000.000
COPIER PAPER A4 75 GSM CT Trident TRIDENT SPECTRA 100 ₹ 17550.000
Bajaj Faratta 500mm Grey Pedestal Fan BAJAJ Bajaj Faratta 500mm Grey Pedestal Fan 2 ₹ 6599.980
WONDER TAPE 2" 35 MTR TRASPARENT TAPE wonder WONDER TAPE 2" 35 MTR TRASPARENT TAPE 100 ₹ 2200.000
HP LaserJet Pro P1108 Printer hp HP LaserJet Pro P1108 2 ₹ 17600.000
Rubber Gloves NA Rubber Gloves 100 ₹ 5900.000
Similar Tenders
Supply of hard facing welding electrodes

Supply of hard facing welding electrodes

Read more
Execution of interior works including wooden flooring, workstations, furniture and other allied works in engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Execution of interior works including wooden flooring, workstations, furniture and other allied works in engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Read more
Procurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana

Procurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise