Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
S/E For Silt Clearance Of Kumhawar Mr. From Km 0.000 To 9.453
|
| Description |
S/E For Silt Clearance Of Kumhawar Mr. From Km 0.000 To 9.453
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDC_844463_11 |
|
Reference Number |
04/EE/2023-24 |
| Tender Fee | 177 |
| EMD | 27000 |
| Tender Value | - |
| Place | Etawah |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 04, 2023 15:30 |
| End Date |
Expired
09/10/2023
Expired 1047 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreS/r to e/w & e/i in the sc/st girls hostel building (g+2) of high school harpur aloth at samastipur, distt.-samastipur.
S/r to e/w & e/i in the sc/st girls hostel building (g+2) of high school harpur aloth at samastipur, distt.-samastipur.
Read moreS/r to e/w & e/i in jan nayak karpuri thakur obc hostel building (g+1) at madhubani, distt.-madhubani
S/r to e/w & e/i in jan nayak karpuri thakur obc hostel building (g+1) at madhubani, distt.-madhubani
Read moreCarrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough
Carrying out borehole drilling (boreholes) from km 29 to km 58 (total length 29 km) for conducting surveys and investigations for preparing the design estimates and detailed project report (dpr) for the project to supply krishna river water to drough
Read moreDepartment of art & culture, government of bihar, invites e-tender from the eligible and experienced agencies for providing professional security services to the department and its institutions.
Department of art & culture, government of bihar, invites e-tender from the eligible and experienced agencies for providing professional security services to the department and its institutions.
Read moreS/r to e/w & e/i in old circuit house building (g+1), annexy building (g+1), canteen building & campus light at circuit house, madubani, distt.-madhubani
S/r to e/w & e/i in old circuit house building (g+1), annexy building (g+1), canteen building & campus light at circuit house, madubani, distt.-madhubani
Read moreConstruction of a pcc road from manpur khizarsarai mian road to prem shankar,s house under ward no. 50. gayaji
Construction of a pcc road from manpur khizarsarai mian road to prem shankar,s house under ward no. 50. gayaji
Read moreE-tender responses invited from experienced agencies for empanelment to provide security ancillary services during multiple examination being conducted by bpsc throughout the state
E-tender responses invited from experienced agencies for empanelment to provide security ancillary services during multiple examination being conducted by bpsc throughout the state
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreof your Industry type