Tender Details
Particulars | Details |
---|---|
Title |
Six Laning Of Surat Nashik Ahmednagar Solapur Mh/Knt Border Greenfield Stretch Package Xi From Nagobachiwadi Village (Km 415.500 To Katgaon Village (Km 450.000) In Maharashtra On Ham Under Nh(o)
|
Description |
Six Laning Of Surat Nashik Ahmednagar Solapur Mh/Knt Border Greenfield Stretch Package Xi From Nagobachiwadi Village (Km 415.500 To Katgaon Village (Km 450.000) In Maharashtra On Ham Under Nh(o)
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_206901_1 |
Reference Number |
NHAI/Tech/MH /S-N-A-S/ Pkg-XI/2024 |
Tender Fee | 1.3 Lakh |
EMD | 12.65 Crore |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=226264 |
Start Date | September 03, 2024 00:25 |
End Date |
01/04/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIe services for 4 laning of parmakudi ramanathapuram sec of nh87 in tamil nadu on ham under nh(o) length46.665 km
Ie services for 4 laning of parmakudi ramanathapuram sec of nh87 in tamil nadu on ham under nh(o) length46.665 km
Read more4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
Read moreConsultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreIndependent engineer services for access controlled highway of 4 lane with paved shoulders from walajapet-ranipet to tn-ap border of nh-40 in tamil nadu on ham under nh(o) (project length-28.021 km)-(2nd call)
Independent engineer services for access controlled highway of 4 lane with paved shoulders from walajapet-ranipet to tn-ap border of nh-40 in tamil nadu on ham under nh(o) (project length-28.021 km)-(2nd call)
Read moreof your Industry type