Tender Details

Particulars Details
Title
For The Work Of 33 Kv And 11 K V Line Strengthening And 11 Kv New Line Construction Work On Semi Turn Key Basis In The Business Plan 2024 25 (Part 2) Scheme Under The Area Of Edd 1 Agra
Description
For The Work Of 33 Kv And 11 K V Line Strengthening And 11 Kv New Line Construction Work On Semi Turn Key Basis In The Business Plan 2024 25 (Part 2) Scheme Under The Area Of Edd 1 Agra.
Organisation Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_DVVNL_977179_1
Reference
Number
32/EDCA/2024-25
Tender Fee 3540
EMD 30000
Tender Value
Place B-690 Kamla Nagar Agra
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1716462
Start Date November 25, 2024 23:30
End Date

10/12/2024 ( Expired 180 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Establishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays on turnkey basis

Establishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays including supply of all equipments/materials, erectio

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Development of distribution infrastructure for feeder segregation work (ag and non ag) of 67 nos. of remaining 11 kv mixed load feeders in barmer lot-2(barmer div.) circle of jodhpur discom (rajasthan) under loss reduction part of rdss scheme

Development of distribution infrastructure for feeder segregation work (ag and non ag) of 67 nos. of remaining 11 kv mixed load feeders in barmer lot-2(barmer div.) circle of jodhpur discom (rajasthan) under loss reduction part of rdss scheme

Read more
Development of distribution infrastructure for feeder segregation work (ag and non ag) of 111 nos. of remaining 11 kv mixed load feeders in barmer lot-1(gudamalani div.) circle of jodhpur discom (rajasthan) under loss reduction part of rdss scheme

Development of distribution infrastructure for feeder segregation work (ag and non ag) of 111 nos. of remaining 11 kv mixed load feeders in barmer lot-1(gudamalani div.) circle of jodhpur discom (rajasthan) under loss reduction part of rdss scheme

Read more
(1)complete cleaning and painting work in new fabricated installed ms shed (inner-outer an upper portion) size 14fit x 30fitand 3fit x 34fit at electricity sub station(nkas) at sijua siding katras area.(2) fabrication of new shed

(1)complete cleaning and &#x0d painting work in new &#x0d fabricated installed ms &#x0d shed (inner-outer an upper &#x0d portion) size 14fit x 30fitand 3fit &#x0d x 34fit at electricity sub&#x0d station(nkas) at sijua &#x0d siding katras area.(2) &#x0d fabrication of new shed

Read more
Extention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion

Extention / diversion &#x0d of 3.3 kv overhead line at &#x0d ocp of akwmc.(2) diversion &#x0d of 3.3 kv feeder to provide &#x0d power to 7 seam to new &#x0d location due to new &#x0d bench &#x0d exposed &#x0d at &#x0d akwmc,katras area-iv.(3) &#x0d dismantling and diversion

Read more
Replacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.

Replacement of damaged equipment installed on the 33kv lines between the 220 kv power substation, chamba, and the 33/11 kv power substation, bhagirathipuram, under the project area, tehri, and painting work on the electric poles.

Read more
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Read more
Reconstructing and realignment of 33 kv selaqui-1 and selaqui-2 line at different locations under edsd, selaqui under edd, mohanpur.

Reconstructing and realignment of 33 kv selaqui-1 and selaqui-2 line at different locations under edsd, selaqui under edd, mohanpur.

Read more
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).

Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise