Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cast In Situ Box Tunnel In Rock Falling Location In Between Ch. 7.660 Km To Ch. 7.890 Km From Hansdiha And Making Suitable Di Line In Connection With New Bg Line Between Hansdiha And Godda.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78240021 |
|
Reference Number |
04-WT-DCE-II-ASN-ER-24-25 |
| Tender Fee | 0 |
| EMD | 14.49 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78240021/viewNitPdf_4761333.pdf |
| Start Date | November 14, 2024 20:07 |
| End Date |
Expired
10/12/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Developement of maintenance infrastructure at godda into lhb maintenance depot in b.g. line between hansdiha and godda.
For complete deion and other details, please refer to tender
Read moreNgp div-removing hard rock / ordinary rock between km 953-30 to km 958 to avoid boulder falling between dks-sks section.
For complete deion and other details, please refer to tender
Read moreJeypore- malkangiri new b.g railway line : geotechnical investigation, geological mapping and desk study of the tunnel alignment etc. between tanginiguda station to govindapalli station i.e., tunnel-1 from ch. 41592m to 42052m, tunnel-2 from ch.42870m to 43620m, tunnel-3 from ch.44181m to 44771m, tunnel-4 from ch.45460m to 45560m, tunnel-5 from ch.50177m to 53177m, tunnel-6 from ch.57503m to 59253m, tunnel-7 from ch.60778m to 61308m, tunnel-8 from ch.61529m to 61709m, tunnel-9 from ch.61919
For complete deion and other details, please refer to tender
Read moreSelection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between
Selection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between thane to borivali
Read moreConstruction of box tunnel on pile foundation with touch piles on both sides between ch 39457 - 39492 and box tunnel (open foundation between ch 39492 - 39620 as slop protection measure in connection with dimapur(dhansari)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreCustom bid for services - additional excavation in mn rock at ug adit surface level in between ch 1
Read more
Providing steel wire grid/mesh at rock falling in cutting between km 952/42 to 953/20 bet. dks-sks section under the jurisdiction aden/gondia.
For complete deion and other details, please refer to tender
Read moreSw-i:aden/sklr sub division : rehabilitation of unlined portion of tunnel no.31 at km.77/100-600 between ydk-svgl station and tunnel no.51 at km.88/100-400 between svgl-sbhr station by method of scaling, rock bolting, shotcrete, wire mesh, rrs, grouting & drainage. sw-ii:aden/sklr sub division : rehabilitation of unlined portion of tunnel no.51 at km.88/100-400 between svgl-sbhr station by method of scaling, rock bolting, shotcrete, wire mesh, rrs, grouting & drainage.
For complete deion and other details, please refer to tender
Read moreDetailed design, 3d monitoring, geotechnical investigation and construction supervision of construction of single line bg tunnel no.1 between ch: 7540 to ch: 11640, (approximate total length 4100 m) including escape tunnel (approximate total length 4100 m) between badiya (ch: 4100 m) - beka (ch: 14750 m) stations of dr. ambedkar nagar (mhow) - sanawad section in connection with ratlam-mhow-khandwa gauge con project of western railway
For complete deion and other details, please refer to tender
Read more(1) extention of tunnel 18a by constructing 100 meter length cut & cover at portal-1 end between ch. 76/964 km to 77/064 km in khongsang-awangkhul section. (2) extention of tunnel t-23a (cut & cover of length=240.40m) at portal-1 end between ch. 84/740 km to 84/980.4 km in awangkhul-noney section and (3) balance work of tunnel -25 from km 89.678 to km 91.056 (misalignment rectification and collapsed portion) and tunnel-26 from km 91.151 to km 92.557 (collapsed portion) including portal
For complete deion and other details, please refer to tender
Read moreof your Industry type