Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Changing Of Previously Installed Damaged Flood Light From Weighbridge Number 6 To Check Post Number 9 Also Extension Of Two Number Conductor From Weighbridge Number 7 To Kundi Village Junction For Controlling Of Street Lights And Tower Light Under M
|
| Description |
Changing Of Previously Installed Damaged Flood Light From Weighbridge Number 6 To Check Post Number 9 Also Extension Of Two Number Conductor From Weighbridge Number 7 To Kundi Village Junction For Controlling Of Street Lights And Tower Light Under M
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_325687_1 |
|
Reference Number |
GM(MS)/SO(EnM)/e-NIT/24-25/71 |
| Tender Fee | 0 |
| EMD | 4455 |
| Tender Value | - |
| Place | Office Of the Project Officer Magadh OCP, M-S Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337594 |
| Start Date | January 14, 2025 17:30 |
| End Date |
Expired
23/01/2025
Expired 628 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Changing of previously installed damaged flood light from weighbridge number 6 to check post number 9 also extension of two number conductor from weighbridge number 7 to kundi village junction for controlling of street lights and tower light under m
Changing of previously installed damaged flood light from weighbridge number 6 to check post number 9 also extension of two number conductor from weighbridge number 7 to kundi village junction for controlling of street lights and tower light under
Read moreMaking arrangement for 415-volt lt power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika campus-kundi the dg installed at weighbridge number 13 the generator at weighbridge number 15 p
Making arrangement for 415-volt lt power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika campus-kundi the dg installed at weighbridge number 13 the generator at weighbridge number 15 for p
Read moreAdoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Adoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi andand chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 an
Read moreAdoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Adoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Read moreLt overhead line shifting due to broadning and making of pqc road near weighbridge 06 to kundi junction, lmv road near weighbridge -12 with extension of height of various tubular poles in nearby road crossing areas from weighbridge 06 to ara new pit
Lt overhead line shifting due to broadning and making of pqc road near weighbridge 06 to kundi junction, lmv road near weighbridge -12 with extension of height of various tubular poles in nearby road crossing areas from weighbridge 06 to ara new pit
Read moreDi of the lt o/h line by laying underground cable with the use of directional boring tools for the construction of the ntpc coal pipe conveyor near weighbridge 07 and kundi 05 number junction, under magadh ocp, m-s area
Di of the lt o/h line by laying underground cable with the use of directional boring tools for the construction of the ntpc coal pipe conveyor near weighbridge 07 and kundi 05 number junction, under magadh ocp, m-s area
Read moreProviding, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Providing, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Read moreProviding, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Providing, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Read moreLt overhead line maintenance (1) from weighbridge 15 to coal stock 32 including sump no-34 (ii) from junction point near coal stock 32 to check post 11 via weighbridge 13 and 17 including weighbridge-18, checkpost-10
Lt overhead line maintenance 
 (1) from weighbridge 15 to coal stock 32 
 including sump no-34 (ii) from junction 
 point near coal stock 32 to check post 11 
 via weighbridge 13 and 17 including 
 weighbridge-18, checkpost-10
Read moreLighting arrangement in water pumping station in back side of coal stock 34 by errection of 5 number tubular pole and laying conductor in previously installed 4 number cement pole under magadh ocp, m-s area
Lighting arrangement in water pumping station in back side of coal stock 34 by errection of 5 number tubular pole and laying conductor in previously installed 4 number cement pole under magadh ocp, m-s area
Read moreof your Industry type