Title
Di Of The Lt O/H Line By Laying Underground Cable With The Use Of Directional Boring Tools For The Construction Of The Ntpc Coal Pipe Conveyor Near Weighbridge 07 And Kundi 05 Number Junction, Under Magadh Ocp, M S Area
Description
Di Of The Lt O/H Line By Laying Underground Cable With The Use Of Directional Boring Tools For The Construction Of The Ntpc Coal Pipe Conveyor Near Weighbridge 07 And Kundi 05 Number Junction, Under Magadh Ocp, M S Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_315762_1
Reference
Number
GM(MS)/SO(EnM)/e-NIT/24-25/42
Tender Fee 0
EMD 21815
Tender Value
Place Office Of the Project Officer Magadh OCP, M-S Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327236
Start Date August 24, 2024 16:30
End Date

02/09/2024 ( Expired 230 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Reinstatement of mdr-30(part) excavated by electricity department for laying of underground lt cable from ghano to velkas junction savoiverem in v.p. v.p. verem vaghurme in priol

Reinstatement of mdr-30(part) excavated by electricity department for laying of underground lt cable from ghano to velkas junction savoiverem in v.p. v.p. verem vaghurme in priol

Read more
Di of the lt o/h line by laying underground cable with the use of directional boring tools for the construction of the ntpc coal pipe conveyor near weighbridge 07 and kundi 05 number junction, under magadh ocp, m-s area

Di of the lt o/h line by laying underground cable with the use of directional boring tools for the construction of the ntpc coal pipe conveyor near weighbridge 07 and kundi 05 number junction, under magadh ocp, m-s area

Read more
Maintenance of two number of 11 kv/440v transformer installed at avantika project office, kundi and near road weighbridge- 16, chamatu as well as replacement of transformer outgoing metering unit cable by high capacity at magadh ocp, m-s area

Maintenance of two number of 11 kv/440v transformer installed at avantika project office, kundi and near road weighbridge- 16, chamatu as well as replacement of transformer outgoing metering unit cable by high capacity at magadh ocp, m-s area

Read more
Planning, design and commissioning of alternate arrangement for transferring coal from magadh ocp to ntpc conveyor 10 mty,at magadh ocp with all civil,electrical and mech.works on turnkey basis and operation and maintenance of plant for five years

Planning, design and commissioning of alternate arrangement for transferring coal from magadh ocp to ntpc conveyor 10 mty,at magadh ocp with all civil,electrical and mech.works on turnkey basis and operation and maintenance of plant for five years

Read more
Power interconnectivity from 20 kva dg backup power arrangement in weighbridge number 5 from weighbridge number 9 by erection of overhead line route length 900 meter under magadh ocp, m-s area

Power interconnectivity from 20 kva dg backup power arrangement in weighbridge number 5 from weighbridge number 9 by erection of overhead line route length 900 meter under magadh ocp, m-s area

Read more
Periodic (fortnightly) checking of road weighbridges (running road weighbridge 05, 06, 07, 09,10, 11, 12,13, 14,15, 16, 17, 18, 19, 20, 21) by using ci test weight to implement the latest sop of road weighbridge for a period of one year at magadh ocp

Periodic (fortnightly) checking of road weighbridges (running road weighbridge 05, 06, 07, 09,10, 11, 12,13, 14,15, 16, 17, 18, 19, 20, 21) by using ci test weight to implement the latest sop of road weighbridge for a period of one year at magadh ocp

Read more
Di rerouting of lt oh line, ht double pole due to infringement of 25 kv high tension line and also dismantling of previously installed tubular pole for freeing the coal loading zone at phulbasiya siding line no 01 under magadh ocp, m-s area

Di rerouting of lt oh line, ht double pole due to infringement of 25 kv high tension line and also dismantling of previously installed tubular pole for freeing the coal loading zone at phulbasiya siding line no 01 under magadh ocp, m-s area

Read more
Di rerouting of lt oh line, ht double pole due to infringement of 25 kv high tension line and also dismantling of previously installed tubular pole for freeing the coal loading zone at phulbasiya siding line no 01 under magadh ocp, m-s ar

Di rerouting of lt oh line, ht double pole due to infringement of 25 kv high tension line and also dismantling of previously installed tubular pole for freeing the coal loading zone at phulbasiya siding line no 01 under magadh ocp, m-s ar

Read more
Covering of load cell cable by gi and flexible pipe from weighbridge load cell to junction box and making them tamper proof by proper sheathing clamping at all road weighbridges of magadh ocp under m-s area

Covering of load cell cable by gi and flexible pipe from weighbridge load cell to junction box and making them tamper proof by proper sheathing clamping at all road weighbridges of magadh ocp under m-s area

Read more
Lighting arrangement in water pumping station in back side of coal stock 34 by errection of 5 number tubular pole and laying conductor in previously installed 4 number cement pole under magadh ocp, m-s area

Lighting arrangement in water pumping station in back side of coal stock 34 by errection of 5 number tubular pole and laying conductor in previously installed 4 number cement pole under magadh ocp, m-s area

Read more