Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Changing Of Previously Installed Damaged Flood Light From Weighbridge Number 6 To Check Post Number 9 Also Extension Of Two Number Conductor From Weighbridge Number 7 To Kundi Village Junction For Controlling Of Street Lights And Tower Light Under M
|
| Description |
Changing Of Previously Installed Damaged Flood Light From Weighbridge Number 6 To Check Post Number 9 Also Extension Of Two Number Conductor From Weighbridge Number 7 To Kundi Village Junction For Controlling Of Street Lights And Tower Light Under
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_321834_1 |
|
Reference Number |
GM(MS)/SO(EnM)/e-NIT/24-25/59 |
| Tender Fee | 0 |
| EMD | 4455 |
| Tender Value | - |
| Place | Office Of the Project Officer Magadh OCP, M-S Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333605 |
| Start Date | November 25, 2024 17:30 |
| End Date |
Expired
04/12/2024
Expired 644 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Changing of previously installed damaged flood light from weighbridge number 6 to check post number 9 also extension of two number conductor from weighbridge number 7 to kundi village junction for controlling of street lights and tower light under m
Changing of previously installed damaged flood light from weighbridge number 6 to check post number 9 also extension of two number conductor from weighbridge number 7 to kundi village junction for controlling of street lights and tower light under m
Read moreChanging of underground damaged 16 sq mm 4 core aluminum armoured cable from weighbridge number 19 to coal stock 32 tower light under magadh ocp, m-s area
Changing of underground damaged 16 sq mm 4 core aluminum armoured cable from weighbridge number 19 to coal stock 32 tower light under magadh ocp, m-s area
Read moreMaking arrangement for 415-volt lt power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika campus-kundi the dg installed at weighbridge number 13 the generator at weighbridge number 15 p
Making arrangement for 415-volt lt power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika campus-kundi the dg installed at weighbridge number 13 the generator at weighbridge number 15 for p
Read moreAdoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Adoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi andand chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 an
Read moreAdoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Adoption of earth leakage and over current relay protection of bus bars installed in two number 500 kva transformer in kundi and chamatu, 62.5 kva diesel generator outgoing panel of avantika project office, weighbridge number 12, weighbridge 13 and
Read morePower interconnectivity from 20 kva dg backup power arrangement in weighbridge number 5 from weighbridge number 9 by erection of overhead line route length 900 meter under magadh ocp, m-s area
Power interconnectivity from 20 kva dg backup power arrangement in weighbridge number 5 from weighbridge number 9 by erection of overhead line route length 900 meter under magadh ocp, m-s area
Read moreProviding, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Providing, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Read moreProviding, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Providing, fixing, and changing of previously installed phase separators of 125 number span to pr unwanted short circuit causes due to clapping of conductors on high wind during the rainy season, with changing of damaged insulators, cradleguard
Read moreof your Industry type