Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening Strengthening Work From Km 1to 17 To (200)of Jhandi Shardanager Aflex Bandha Link Road
|
| Description |
Widening Strengthening Work From Km 1to 17 To (200)of Jhandi Shardanager Aflex Bandha Link Road
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2025_CEUCZ_1016663_1 |
|
Reference Number |
1118/352C-ETENDER/2025 dated 17/02/2025 |
| Tender Fee | 2715 |
| EMD | 38.81 Lakh |
| Tender Value | |
| Place | Lakhimpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832392 |
| Start Date | March 12, 2025 14:30 |
| End Date |
Expired
05/04/2025
Expired 457 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreRepair of link road hardoi neer road to kataiya. (l-1.10 km)
Repair of link road hardoi neer road to kataiya. (l-1.10 km)
Read moreWidening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes. recall
Widening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes. recall
Read morePreparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Preparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreMacadamization of road from sopat surrender gujjar basti qazigund kulgam km 1st
Macadamization of road from sopat surrender gujjar basti qazigund kulgam km 1st
Read moreof your Industry type