| Particulars | Details |
|---|---|
| Title |
Extension Of Rcc Drain From Surge Silo To Main Drain Under Rocp.
|
| Description |
Extension Of Rcc Drain From Surge Silo To Main Drain Under Rocp.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_312639_1 |
|
Reference Number |
ECL/RJML/AGM/AE(C)/ e-Ten/24-25/37 Dt-15.07.2024 |
| Tender Fee | 0 |
| EMD | 22100 |
| Tender Value | - |
| Place | Rajmahal OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323992 |
| Start Date | July 16, 2024 00:25 |
| End Date |
Expired
25/07/2024
Expired 790 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read moreGodavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreProcurement of di(k7) pipes for the sanctions obtained from the month of april-2026 to july-2026 at sahebnagar stores, sub division-iv, under central stores division. estimate no.est-sbn-202600067
Procurement of di(k7) pipes for the sanctions obtained from the month of april-2026 to july-2026 at sahebnagar stores, sub division-iv, under central stores division. estimate no.est-sbn-202600067
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreof your Industry type