Tender Details
Particulars | Details |
---|---|
Title |
Providing Mild Steel Fencing On Lhs And Rhs Of Sedimentation Tank Of Lbmc Of Tip At Ch.28.600 Km At Cuchelim Village Of Bardez Taluka (Re Tender).
|
Description |
Providing Mild Steel Fencing On Lhs And Rhs Of Sedimentation Tank Of Lbmc Of Tip At Ch.28.600 Km At Cuchelim Village Of Bardez Taluka (Re Tender).
|
Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WRD_21797_1 |
Reference Number |
WRD/WDVIII/A/F6/25-26/TN-02(3) |
Tender Fee | 7426 |
EMD | 44268 |
Tender Value | |
Place | Cuchelim Village, Bardez Taluka, Goa. |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=22228 |
Start Date | April 11, 2025 17:15 |
End Date |
18/04/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreDesign constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Design constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Read moreIndependent engineer services for supervision of development and operations of multi modal logistics park mmlp pune at village pawalewadi, maval taluka, district pune in the state of maharashtra through ppp on dbfot basis
Independent engineer services for supervision of development and operations of multi modal logistics park mmlp pune at village pawalewadi, maval taluka, district pune in the state of maharashtra through ppp on dbfot basis
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreDevelopment operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Development operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Read moreFdr / mtc. of bailey type unit steel bridges and installation of spun pipe at different locations under jatanbari pwd (randb) sub-division /sh- dismantling and launching bailey type unit steel bridge at jatanbari-lambacherra road(ch-20.50 km), provid
Fdr / mtc. of bailey type unit steel bridges and installation of spun pipe at different locations under jatanbari pwd (randb) sub-division /sh- dismantling and launching bailey type unit steel bridge at jatanbari-lambacherra road(ch-20.50 km), provid
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreof your Industry type