Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of 6 Lane Standalone Single Span Grade Separated Structure At Km 532 552 On Gonde Vadape Section Of Nh 3 New Nh 848 In The State Of Maharashtra Balance Work On Epc Mode
|
| Description |
Design And Construction Of 6 Lane Standalone Single Span Grade Separated Structure At Km 532 552 On Gonde Vadape Section Of Nh 3 New Nh 848 In The State Of Maharashtra Balance Work On Epc Mode
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_165326_1 |
|
Reference Number |
NHAI/RO/MUM/NSK/DP/Bapgaon |
| Tender Fee | 10000 |
| EMD | 49.52 Lakh |
| Tender Value | - |
| Place | NHAI RO Mumbai |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | August 23, 2023 14:30 |
| End Date |
Expired
25/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreSix laning of existing 4lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh-848 (old nh-3) (design length 19.712 km.) on epc mode under nh(o) in the state of maharashtra.
Six laning of existing 4lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh-848 (old nh-3) (design length 19.712 km.) on epc mode under nh(o) in the state of maharashtra.
Read moreUrgent maintenance and safety related works on i vadape gonde ii dhule pimpalgaon iii pimpalgaon nashik gonde section of nh 03 and iv shirdi sinnar section of nh 160 at the risk and cost of concessionaire contractor in the state of maharashtra
Urgent maintenance and safety related works on i vadape gonde ii dhule pimpalgaon iii pimpalgaon nashik gonde section of nh 03 and iv shirdi sinnar section of nh 160 at the risk and cost of concessionaire contractor in the state of maharashtra
Read moreCons. of slip/service road at various locations (25.140 km (lhs-rhs) flyover (2x25m) at borivali jun. (km. 528.550) and lvup (1x15m) at sherekarpada (528.800)on pimprisado-vadape sec. of nh-848 from 460.900 to km. 537.000 in maharashtra on epc nh(o)
Cons. of slip/service road at various locations (25.140 km (lhs-rhs) flyover (2x25m) at borivali jun. (km. 528.550) and lvup (1x15m) at sherekarpada (528.800)on pimprisado-vadape sec. of nh-848 from 460.900 to km. 537.000 in maharashtra on epc nh(o)
Read moreSix laning of existing 4-lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh-848 (old nh-3) (design length 19.712 km.) under nh(o) in the state of maharashtra on hybrid annuity mode
Six laning of existing 4-lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh-848 (old nh-3) (design length 19.712 km.) under nh(o) in the state of maharashtra on hybrid annuity mode
Read moreConstruction of grade separated structure at km 407 on yavatmal wardha section of nh-361 in the state of maharashtra on epc mode
Construction of grade separated structure at km 407 on yavatmal wardha section of nh-361 in the state of maharashtra on epc mode
Read moreIe services for six laning of existing 4 lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh 848 (old nh3) (length 19.712 km.) under nh(o) in maharashtra on hybrid annuity mode
Ie services for six laning of existing 4 lane section from gonde (km. 439.038) to pimpri sado (km. 459.905) section of nh 848 (old nh3) (length 19.712 km.) under nh(o) in maharashtra on hybrid annuity mode
Read moreConstruction of rob with approaches on nh 848 b at udvada, railway crossing lc no 87 at km 181/18/20 in the state of gujarat on epc mode under nh o
Construction of rob with approaches on nh 848 b at udvada, railway crossing lc no 87 at km 181/18/20 in the state of gujarat on epc mode under nh o
Read moreConstruction of rob with approaches on nh 848 b at udvada, railway crossing lc no 87 at km 181/18/20 in the state of gujarat on epc mode under nh o
Construction of rob with approaches on nh 848 b at udvada, railway crossing lc no 87 at km 181/18/20 in the state of gujarat on epc mode under nh o
Read moreConstruction of 12 nos of standalone safety structures/works at different locations on nh-3 in the state of maharashtra on epc mode.
Construction of 12 nos of standalone safety structures/works at different locations on nh-3 in the state of maharashtra on epc mode.
Read moreof your Industry type