Particulars | Details |
---|---|
Title |
Providing 33 Kv Source Of Supply To New 33/11 Kv Mpdo Ss
|
Description |
Providing 33 Kv Source Of Supply To New 33/11 Kv Mpdo Sub Station From 132/33 Kv Pashamylaram Eht Sub Station By Erection Of 9.75 Km Of New 33 Kv Feeder From The Eht Ss To The Newly Proposed 33/11 Kv Mpdo Sub Station Which Involves Laying Of 750 Mtrs Of 33 Kv Xlpe 3 X400 Sqmm. Ug Cable (Double Run) And Stringing Of 9.0 Km Of 100 Sqmm. Aaac Over Now Proposed 12.5 Mtr Spun Poles And M9 Towers In Order To Maintain Reliable And Un Interrupted Power Supply To Consumers During The Emergency Line Clears/Shutdowns At
Eht Sub Stations Rc Puram And Patancheru And Also To Cater The Up Coming Future Anticipating Loads During The Summer Season 2025 26 Under T And D Improvement Works (Summer Action Plan 2025)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 572717 |
Reference Number |
CE/OP/Medchal Zone -39/24-25 |
Tender Fee | 3049 |
EMD | 1.72 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | January 29, 2025 00:20 |
End Date |
03/02/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreConst of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Const of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Read moreDraft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreof your Industry type