Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/ Ee/Hd/N Ie T 12 Of 2024 2
|
Description |
Sinking Of Replacement Tube Well (Size 250mm X 200mm Dia) For Operation And Maintenance Of Tube Well No I Under Baigachi W/S Scheme Of Bally Jagacha Surface Based Water Supply Scheme (Phase I) Under Howrah Division, P.H.E. Dte.
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHED_771310_5 |
Reference Number |
WBPHED/ EE/HD/NIeT-12 OF 2024-25 |
Tender Fee | 0 |
EMD | 34900 |
Tender Value | |
Place | Howrah |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707930 |
Start Date | November 20, 2024 23:30 |
End Date |
06/12/2024 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, delivery, installation commissioning of electro mechanical equipments and allied works at dakshinpara (zone-ii) w/s scheme block- hanskhali under eastern mechanical division, p.h.e, dte. dist. nadia. sm/10571
Supply, delivery, installation commissioning of electro mechanical equipments and allied works at dakshinpara (zone-ii) w/s scheme block- hanskhali under eastern mechanical division, p.h.e, dte. dist. nadia. sm/10571
Read moreSupply, delivery, installation commissioning of electro mechanical equipments and allied works at kamalpur zone-ii w/s scheme block- ranaghat-ii under eastern mechanical division, p.h.e, dte. dist. nadia. sm/10596
Supply, delivery, installation commissioning of electro mechanical equipments and allied works at kamalpur zone-ii w/s scheme block- ranaghat-ii under eastern mechanical division, p.h.e, dte. dist. nadia. sm/10596
Read moreDisbursement of arrear wages due to enhancement of daily wages of pump operators engaged in deara w/s scheme under emsd-i p.h.e. dte. dist.- 24pgs(n)
Disbursement of arrear wages due to enhancement of daily wages of pump operators engaged in deara w/s scheme under emsd-i p.h.e. dte. dist.- 24pgs(n)
Read moreAnnual operation and maintenance of different dia ms/di rising main and distribution system pipe line from intake site to panagarh industrial park h/w site under surface based pwss for panagarh industrial park under dwsd,phe dte (1 yr)
Annual operation and maintenance of different dia ms/di rising main and distribution system pipe line from intake site to panagarh industrial park h/w site under surface based pwss for panagarh industrial park under dwsd,phe dte (1 yr)
Read moreAnnual rate contract for construction and commissioning of three phase tube well under sub division rural i nokha, district bikaner with 5 year oandm including 2 year defect liability period
Annual rate contract for construction and commissioning of three phase tube well under sub division rural i nokha, district bikaner with 5 year oandm including 2 year defect liability period
Read moreAAAAAAAAAA
Login to viewOperation and guarding of pumping machinery at pump house no. tw-i, ii of uttar gopalpur water supply scheme block- ramnagar-ii dist.- purba medinipur under midnapore mechanical division, p.h.e. dte.
Read moreAAAAAAAAAA
Login to viewOperation and guarding of pumping machinery at pump house no. tw-i,ii of rammchandrapur water supply scheme block- debra dist.- paschim medinipur under midnapore mechanical division, p.h.e. dte.
Read more12 of ae-i/nacd-ii of 2024-2025 2nd call
Construction of boundary wall with grill gate and barbed wire fencing along with pathway at maniknagar piped water supply scheme 2nd tubewell in santipur block under nadia arsenic civil division-ii, p.h.e dte
Read moreWork of construction and commissioning of 200mm dia. 02 nos tube well at rwss peechupara khurd under division bandikui district dausa
Work of construction and commissioning of 200mm dia. 02 nos tube well at rwss peechupara khurd under division bandikui district dausa
Read moreOperation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Operation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Read moreof your Industry type