Tender Details
About Tender
๐ Invitation For Final Location Survey Bid Silaut To Turki By Pass ๐๐ง The Ministry Of Railways, Specifically The Central Government's East Central Railway Division, Is Seeking Bids From Experienced Firms For Conducting A Final Location Survey For The Construction Of A Proposed By Pass Line Between Silaut (Slt) And Turki (Tur) Stations, Spanning Approximately 15 Km In The Sonpur Division. ๐บ๏ธ ๐ Bid Submission Deadline: April 03, 2024, 2:30 Pm ๐ธ Earnest Money Deposit (Emd): Inr 5,70,000 Interested Firms Must Submit Detailed Proposals, Including Methodologies, Timelines, And Compliance With Survey Standards, By The Specified Deadline. ๐ Keywords: Final Location Survey, Construction, By Pass Line, East Central Railway, Ministry Of Railways, Government Tender, Civil Engineering SurveyParticulars | Details |
---|---|
Title |
Carrying Out Final Location Survey For Construction Of Proposed By Pass Line Between Silaut (Slt) Turki (Tur) Section (Approx. 15 Km.) In Sonpur Division Of East Central Railway.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74095721 |
Reference Number |
ECR-CAO-C-N-ETN-68-23-24 |
Tender Fee | 0 |
EMD | 57000 |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74095721/viewNitPdf_4507903.pdf |
Start Date | March 12, 2024 18:11 |
End Date |
03/04/2024 ( Expired 404 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur
Read moreSurvey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km
Construction of new railway siding with proposed feeder line of east rail corridor at pelma, raigarh area of secl taking off from bhalumuda pelma section under secr ch minus 1527 28481.542 f ggda to ch 1156.91m 31165.452m f ggda about 2.7 km
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreConstruction of road over bridge at km 0/6 of thaneerpandal road in lieu of existing lc.no.6 at railway km 6/15-17 in between singanallur - peelamedu railway stations (road over bridge and approach road only).
Construction of road over bridge at km 0/6 of thaneerpandal road in lieu of existing lc.no.6 at railway km 6/15-17 in between singanallur - peelamedu railway stations (road over bridge and approach road only).
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreof your Industry type