Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Final Location Surveys For Construction Of Proposed 3 Rd &Amp 4 Th Line Between Chhapra Kacheri Sonpur Muzaffarpur Samastipur Bachchwara Barauni Katihar (Excl. Barauni Bachchwara Section) And Hajipur Bachchwara (Via Spp) Section (450.00 Km) In Sonpur Division Of East Central Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72991542 |
|
Reference Number |
ECR-CAO-C-N-ETN-59-23-24 |
| Tender Fee | 0 |
| EMD | 5.77 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72991542/viewNitPdf_4448230.pdf |
| Start Date | January 09, 2024 20:45 |
| End Date |
Expired
31/01/2024
Expired 988 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strenghening and other allied work at rob no. 25 of barauni-katihar section in sonpur division.
For complete deion and other details, please refer to tender
Read moreZone no. 11 : - zonal works for section : hajipur (in) - chhapra kachehri (ex) (excluding sonpur complex) under sse/w/hjp.
For complete deion and other details, please refer to tender
Read more(1) sonpur division (dn/sl) : tfr = 36.217 km. (2) hajipur - chhapra gra:- tbr = 8.779 tkm. (ballasting of track including 300 mm deep screening with bcm.)
For complete deion and other details, please refer to tender
Read moreBalance work for provision of inspection ladder over end racker and inspection pathway for top chord of br.no. 16 dn katihar - barauni section in sonpur division under dy.ce/brl/ hjp.
For complete deion and other details, please refer to tender
Read more(1) sonpur division: bachhwara-chhapra katcheri :- through 1:12 point & xing sleeper renewal (p) of existing on psc 6 sleeper with new 60 kg psc 6 sleeper = 11 set (2) sonpur division: hajipur-bachhwara :-hrough 1:12 point & xing sleeper renewal (p) of existing on psc 6 sleeper with new 60 kg psc 6 sleeper = 11 set. (3)sonpur division: hajipur-chhapra katcheri:-through rail renewal (s) of existing 52 kg/90 uts rails on psc sleeper with sh 52kg/90uts rails at nyo loop line no-4 =
For complete deion and other details, please refer to tender
Read more(1)barauni - katihar (up/dn): tbr - 14.365 tkm & kgg-spj (sl): tbr - 0.990 tkm. (2) sonpur division. (up/sl) - tfr - 12.825 tkm (under jurisdiction of sr. den/ii/see). (3) sonpur division: sej - 11 sets & glued joints - 331 nos. (under jurisdiction of sr. den/ii/see).
For complete deion and other details, please refer to tender
Read moreCarrying out final location surveys for construction of proposed ror between (i) bachhwara (bca)-teghra (tga) - (approx-9.0km), (ii) teghra (tga)-dinkargram simaria(dkgs) - (approx-15.0km), (iii) at khagaria (kgg) station - (approx-4.0km) & (iv) at mansi (mne) station - (approx-5.0km), (v) at darbhanga (dbg) station - (approx-20.0km) and samastipur (spj) bye-pass - (approx-16.0km) (total-69.00 km) in sonpur/samastipur division of east central railway.
For complete deion and other details, please refer to tender
Read more(i) sonpur division: barauni - katihar :- through rail renewal (p) of existing 52kg/90 uts rails on psc 6 sleeper with new 60 kg/90 uts rails on dn line from km 29.40 - 31.14 total trr/p = 1.74 km. (ii) sonpur division: barauni-katihar:- through rail renewal (p) of existing 52kg/90 uts rails on psc 6 sleeper with new 60 kg/90 uts rails on dn line from km 128.43 - 128.68 & up line from km. 45.67- 46.41, total trr/p = 0.99 km. (iii) through rail renewal (s) of existing 52 kg /90 uts rails on
For complete deion and other details, please refer to tender
Read moreConstruction of 4 nos. new balancing culvert of opening size 1 x 5.0 x 4.0 mtr each at km. 96/07-09 between gai - psr, km. 88/01-03 between psr-nnr, km. 78/15-17 between nnr-thb & km. 133/11-13 between skj-umnr in barauni - katihar section of sonpur division.
For complete deion and other details, please refer to tender
Read moreConstruction of 4 nos. new balancing culvert of opening size 1 x 5.0 x 4.0 mtr each at km. 96/07-09 between gai - psr, km. 88/01-03 between psr-nnr, km. 78/15-17 between nnr-thb & km. 133/11-13 between skj-umnr in barauni - katihar section of sonpur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type