Tender Details

Particulars Details
Title
Rate Contract For Carrying Out Final Location Survey (Geotechnical Studies, Design & Preparation Of Drawing) And Other Preliminary Activities For Preparation Of Dpr (Including Electrical, Signal, Operating/ Traffic Works And Preparation Of Epc Bid Package) In Connection With Survey For New Line, Bye Pass Line, Doubling/Multitracking, Flyover Etc. In E.C.Railway Including Providing Facilitation To Competent Authority For Land Acquisition (Cala) For Land Acquisition Work To The Railway Proje
Description
Rate Contract For Carrying Out Final Location Survey (Geotechnical Studies, Design & Preparation Of Drawing) And Other Preliminary Activities For Preparation Of Dpr (Including Electrical, Signal, Operating/ Traffic Works And Preparation Of Epc Bid Package) In Connection With Survey For New Line, Bye Pass Line, Doubling/Multitracking, Flyover Etc. In E.C.Railway Including Providing Facilitation To Competent Authority For Land Acquisition (Cala) For Land Acquisition Work To The Railway Proje
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 08, 2026 00:59
End Date
Open 04/12/2026

50 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engagement of consultancy services for survey, investigation, feasibility studies, hydrological and geotechnical investigations....

Engagement of consultancy services for survey, investigation, feasibility studies, hydrological and geotechnical investigations....

Read more
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Read more
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Read more
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
Preliminary survey and preparation of survey plan for construction of bye pass road to sh-1 from supachipud to bombay road junction in sankhali constituency between chainages 25005 mts to 38005mts

Preliminary survey and preparation of survey plan for construction of bye pass road to sh-1 from supachipud to bombay road junction in sankhali constituency between chainages 25005 mts to 38005mts

Read more
Conducting preliminary and detailed survey geotechnical investigation designing estimation preparation of different drawings required for preparation of fsr dpr and obtaining its approval from railways and proof checking of drawings required for cons

Conducting preliminary and detailed survey geotechnical investigation designing estimation preparation of different drawings required for preparation of fsr dpr and obtaining its approval from railways and proof checking of drawings required for cons

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise