Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Line Distance Relay
|
| Description |
|
| Organisation | Department of Higher Education | Ministry of Education |
| Tender Id | GEM/2024/B/4638678 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 20, 2024 18:42 |
| End Date |
Expired
12/03/2024
Expired 840 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of contractor block landt bch overload relay sdz5 timer at various pumping installation in sector 10 panchkula
Replacement of contractor block landt bch overload relay sdz5 timer at various&#x0d pumping installation in sector 10 panchkula
Read moreConstruction of various infrastructures at camp of 48 bn itb police, katihar (bihar) at an altitude of 9320 feet and a distance of approx. 25 km from chungthang, distt-mangan, north sikkim. camp connected by road.
Construction of various infrastructures at camp of 48 bn itb police, katihar (bihar) at an altitude of 9320 feet and a distance of approx. 25 km from chungthang, distt-mangan, north sikkim. camp connected by road.
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreUpgradation of power line at ind. area boranada ph-iv and epipi
Upgradation of power line at ind. area boranada ph-iv and epipi
Read moreProvn of slope stablization work at jn line of cijw school vairengte
Provn of slope stablization work at jn line of cijw school vairengte
Read moreExpression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Expression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Read moreDe-silting of sewer lines and storm water lines by super sucker machine, dia. 300 mm main line and 150 mm branch line at hsiidc apartment sector-31, gurugram
De-silting of sewer lines and storm water lines by super sucker machine, dia. 300 mm main line and 150 mm branch line at hsiidc apartment sector-31, gurugram
Read moreC/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
C/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
Read moreof your Industry type