Erection Of Pole Installation Of Lightning Arrestor With Earth Pit And Draw Partial Lt Overhead Line 415 V 3phase For Providing Power Suuply To Road Weighbridge Near Check Post No 3 Under Rwp
|
| Description |
Erection Of Pole Installation Of Lightning Arrestor With Earth Pit And Draw Partial Lt Overhead Line 415 V 3phase For Providing Power Suuply To Road Weighbridge Near Check Post No 3 Under Rwp
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_338938_1 |
|
Reference Number |
GM(R)/ SO(W)/Rjp/25-26/Et/35 dt 05.07.25 |
| Tender Fee | 0 |
| EMD | 4700 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=351340 |
| Start Date | July 07, 2025 23:30 |
| End Date |
Expired
17/07/2025
Expired 452 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of overhead line two source of power supply for weighbridge 3 phase 4wire ckt with spdat road weighbridge no 5 i.e.sudamdih sidingand lightning arrestor erection with internal wiring and light fitting under e.j.area
Erection of overhead line two source of power supply for weighbridge 3 phase 4wire ckt with spdat road weighbridge no 5 i.e.sudamdih sidingand lightning arrestor erection with internal wiring and light fitting under e.j.area
Read moreInstallation of lightning arrestor and proper earthing in newly shifted weighbridge near reject stock under rajrappa washery project
Installation of lightning arrestor and proper earthing in newly shifted weighbridge near reject stock under rajrappa washery project
Read moreInstallation of lightning arrestor and proper earthing in newly shifted weighbridge near reject stock under rajrappa washery project
Installation of lightning arrestor and proper earthing in newly shifted weighbridge near reject stock under rajrappa washery project
Read moreInstallation of lightning arrestor, goab, earth pit along with accessories in 11kv overhead line at main sub- station (2x3mva) and dismantling erection of overhead line at weighbridge no. 01, under rohini ocp, nk area
Installation of lightning arrestor, 
 goab, earth pit along with 
 accessories in 11kv overhead 
 line at main sub- station 
 (2x3mva) and dismantling
 erection of overhead line at 
 weighbridge no 01, under 
 rohini ocp, nk area
Read moreInstallation of mesh type lightning arrestor system at dakra check post and repairing/ reconditioning of existing mesh type lightning arrestor system at road weighbridge no. 01 and 02 under dakra project, nk area
Installation of mesh type lightning arrestor system at dakra check post and repairing/ reconditioning of existing mesh type lightning arrestor system at road weighbridge no. 01 and 02 under dakra project, nk area
Read moreErection of overhead line for two source of power supply to sudamdih siding road weighbridge , 3 phase 4 wire circuit from railway siding to sudamdih siding road weighbridge and lightning arrestor erection with internal wiring and light fitting under
Erection of overhead line for two source of power supply to sudamdih siding road weighbridge , 3 phase 4 wire circuit from railway siding to sudamdih siding road weighbridge and lightning arrestor erection with internal wiring and light fitting under
Read morePartial electrical wiring and providing proper power controlling switches for safety of all connected electrical and electronic equipments with lightning arrestor and earth pits and its accessories as and when basis at both rail in motion weighbridge
Partial electrical wiring and providing proper power controlling switches for safety of all connected electrical and electronic equipments with lightning arrestor and earth pits and its accessories as and when basis at both rail in motion weighbridge
Read moreErection ofoverhead line two source of power supply for weighbridge 3 phase 4wire ckt with spd at asp colliery deco camp to road weighbridge no 4 i.e. asp colliery weighbridge and lightning arrestor erection with internal wiring and light fitting un
Erection ofoverhead line two source of power supply for weighbridge 3 phase 4wire ckt with spd at asp colliery deco camp to road weighbridge no 4 i.e. asp colliery weighbridge and lightning arrestor erection with internal wiring and light fitting un
Read moreErection of overhead line for two source of power supply to asp colliery road weigh bridge, 3 phase 4 wire circuit from asp colliery decco camp and 14 no. substation to asp colliery road weighbridge and lightning arrestor erection with internal wirin
Erection of overhead line for two source of power supply to asp colliery road weigh bridge, 3 phase 4 wire circuit from asp colliery decco camp and 14 no. substation to asp colliery road weighbridge and lightning arrestor erection with internal wirin
Read moreInstallation of lightning arrestor, goab, earth pit along with accessories and tree trimming at 11kv overhead line at substation, rrs under regional repair shop dakra, nk area.
Installation of lightning arrestor, goab, earth pit along with accessories and tree trimming at 11kv overhead line at substation, rrs under regional repair shop dakra, nk area.
Read moreof your Industry type