Tender Details
Particulars | Details |
---|---|
Title |
Evacuation Of Settled Ash 300000 Cum From Ash Pond 1 And Ash Pond 2, Transportation And Disposal Beyond 2 Km In Eco Friendly Manner From Stps, Purulia
|
Description |
Evacuation Of Settled Ash 300000 Cum From Ash Pond 1 And Ash Pond 2, Transportation And Disposal Beyond 2 Km In Eco Friendly Manner From Stps, Purulia
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2024_WBPDC_661509_1 |
Reference Number |
WBPDCL/CORP/NIT/E1805, S-798 (Civil-O and M) |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Santaldih TPP, Purulia, WB |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1432979 |
Start Date | February 13, 2024 00:00 |
End Date |
20/02/2024 ( Expired 458 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreShort term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreE open tender cum reverse auction for evacuation of 13.00 lakh cum ash from ash pond 1 and 2, transportation, disposal at a distance of 20 km and beyond, with 300 mm thick earth covering in eco friendly manner at bktps, wbpdcl
E open tender cum reverse auction for evacuation of 13.00 lakh cum ash from ash pond 1 and 2, transportation, disposal at a distance of 20 km and beyond, with 300 mm thick earth covering in eco friendly manner at bktps, wbpdcl
Read moreE open tender cum reverse auction for evacuation of 10.00 lakh cum ash from ash pond 1 and 2, transportation, disposal at a distance of 20 km and beyond with 300 mm thick earth covering in eco friendly manner at bktps, wbpdcl
E open tender cum reverse auction for evacuation of 10.00 lakh cum ash from ash pond 1 and 2, transportation, disposal at a distance of 20 km and beyond with 300 mm thick earth covering in eco friendly manner at bktps, wbpdcl
Read moreof your Industry type