Tender Details

About Tender

🏭 Urgent: Ash Pond Ash Evacuation Project 🚛🌱 The West Bengal Power Development Corporation Ltd., A State Government Entity, Is Seeking Bids For The Comprehensive Evacuation, Transportation, And Eco Friendly Disposal Of Settled Ash From Ash Ponds 1 And 2 At Stps, Purulia. The Project Scope Includes The Handling Of 300,000 Cum Of Ash. 📅 Bid Submission Deadline: June 19, 2024, 3:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 10,25,000. Proposals Should Detail The Methodology For Environmentally Friendly Disposal, Adhering To All Safety And Environmental Regulations. Keywords: Ash Pond, Ash Evacuation, Settled Ash, Transportation, Disposal, Eco Friendly, The West Bengal Power Development Corporation Ltd., State Govt. And Ut, Tender, Bid, Purulia, Wb
Particulars Details
Title
Evacuation Of Settled Ash 300000 Cum From Ash Pond 1 And Ash Pond 2, Transportation And Disposal Beyond 2 Km In Eco Friendly Manner From Stps, Purulia
Description
Evacuation Of Settled Ash 300000 Cum From Ash Pond 1 And Ash Pond 2, Transportation And Disposal Beyond 2 Km In Eco Friendly Manner From Stps, Purulia&Amp#X0d
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2024_WBPDC_689766_1
Reference
Number
WBPDCL/CORP/NIT/E1848/24-25, S-854
Tender Fee 0
EMD 10.25 Lakh
Tender Value
Place SNTD, Purulia, WB
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1502256
Start Date June 14, 2024 23:00
End Date

19/06/2024 ( Expired 352 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Sitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings

Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter

Read more
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Read more
Annual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis

Annual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis

Read more
Construction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.

Construction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise