Tender Details

Particulars Details
Title
Evacuation And Disposal Of 1.5 Lac Cu M Settled Ash From Ash Pond Of Stps ,Wbpdcl
Description
Evacuation And Disposal Of 1.5 Lac Cu M Settled Ash From Ash Pond Of Stps ,Wbpdcl
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2024_WBPDC_766546_1
Reference
Number
WBPDCL/CORP/NIT/E1941/24-25
Tender Fee 0
EMD 6 Lakh
Tender Value
Place Santaldih Thermal Power
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1697354
Start Date November 14, 2024 16:30
End Date

29/11/2024 ( Expired 190 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise