Tender Details

Particulars Details
Title
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1 Meter Length Coal Pipes After Moe Mill Outlet Elbow In Coal Mill 4 A To 4 F During Capital Overhaul 2025 26
Description
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1 Meter Length Coal Pipes After Moe Mill Outlet Elbow In Coal Mill 4 A To 4 F During Capital Overhaul 2025 26
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_558256_1
Reference
Number
CE / MTPS-I / SE / M-I / MP /OT.85/ 2025-26
Tender Fee 0
EMD 19300
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=666751

Start Date May 15, 2025 18:00
End Date
Expired 29/05/2025

Expired 504 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27

Mtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27

Mtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil

Read more
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f

Read more
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27

Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27

Read more
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Read more
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise