Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1 Meter Length Coal Pipes After Moe Mill Outlet Elbow In Coal Mill 4 A To 4 F During Capital Overhaul 2025 26
|
Description |
Mtps I Mill Plant Unit Iv Dismantling Hard Facing And Assembling Of 1 Meter Length Coal Pipes After Moe Mill Outlet Elbow In Coal Mill 4 A To 4 F During Capital Overhaul 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 19300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 18:00 |
End Date |
29/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Mtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreMtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Mtps i tm unit i replacing the existing defective constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2025 26
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreNctps i se mi circle mill plant maintenance division capital overhaul works for the year 25 26 specification no 265 24 2
Nctps i se mi circle aoh coh 25 26 mpm dn unit i replacement of insulation in the hot air duct for mills 1a to 1f including supply of necessary insulation gi sheet and consumables during the modular replacement of duct existing insulation
Read moreof your Industry type