Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Hard Facing Of Vertical Coal Pipe 1mtr Length After Transition Piece 24 Nos In Mill 4 A To Mill 4 F During Capital Overhaul 2025 26
|
Description |
Mtps I Mill Plant Unit Iv Hard Facing Of Vertical Coal Pipe 1mtr Length After Transition Piece 24 Nos In Mill 4 A To Mill 4 F During Capital Overhaul 2025 26
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_558274_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT. 93 / 2025-26 |
Tender Fee | 0 |
EMD | 6900 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=666783 |
Start Date | May 15, 2025 18:30 |
End Date |
29/05/2025 ( Expired 8 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Mtpsi mill plant unit i overhauling of classifier assemblies replacement repairing of eroded cone cone drum section venture vanes venturi collars during aoh 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i bm unit i boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit i boiler pressure parts aoh 2025 reconditioning and hard facing of used and wornout square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreTtps operation circle mpm ii unit iv overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 4a to 4f during forthcoming overhaul
Ttps operation circle mpm ii unit iv overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 4a to 4f during forthcoming overhaul
Read moreof your Industry type