Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cridp Work 2024 25 Soil Slope Stabilization Km.44.8 Iii Top Of Hill Side
|
| Description |
Providing Soil Slope Stabilization Work And Protective Work At Km.44.8 Slope Length50m Of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road&Amp#X0d
Construction Of Breast Wall At Km.44.8 Iii Top Of Hill Sideof Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road
|
| Organisation | Highways | State Govt. and UT |
| Tender Id | 2025_HWAY_554708_1 |
|
Reference Number |
CRIDP Work -2024-25 Soil Slope StabilizationKm.44.8 III Top of Hill Side |
| Tender Fee | 0 |
| EMD | 24200 |
| Tender Value | - |
| Place | coimbatore |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=662453 |
| Start Date | May 06, 2025 17:30 |
| End Date |
Expired
23/05/2025
Expired 506 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRevenue (endowments-ii) department- godavari pushkaralu-2027-teir-iii-irriagtion department works-repairs of pushkar ghat on right side of river godavari at mullakatta(v), eturunagaram(m), mulugu(dist).
Revenue (endowments-ii) department- godavari pushkaralu-2027-teir-iii-irriagtion department works-repairs of pushkar ghat on right side of river godavari at mullakatta(v), eturunagaram(m), mulugu(dist).
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreCridp work -2024-25 soil slope stabilization 44.8 ii
Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 ii of ooty kotagiri mettupalayam sathy gobi erode road
Read moreCridp work2024.25 soil slope stabilization protective wall at km.44.8
Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road &#x0d construction of protective wall at km.44.8 of ooty kotagiri mettupalayam sathy gobi erode road&#x0d
Read moreCridp work -2024-25 soil slope stabilization
Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 i of ooty kotagiri mettupalayam sathy gobi erode road
Read moreDevelopment of parking facility at kailasagiri hill top park visakhapatnam back side of hill top bus stop
Development of parking facility at kailasagiri hill top park visakhapatnam back side of hill top bus stop
Read moreof your Industry type