Tender Details

Particulars Details
Title
Cridp Work2024.25 Soil Slope Stabilization Protective Wall At Km.44.8
Description
Providing Soil Slope Stabilization Work And Protective Work At Km.44.8 Slope Length 50m Of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road &Amp#X0d Construction Of Protective Wall At Km.44.8 Of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road&Amp#X0d
Organisation Highways | State Govt. and UT
Tender Id 2025_HWAY_554892_1
Reference
Number
CRIDP Work2024.25 Soil Slope Stabilization Protective wall at Km.44.8
Tender Fee 0
EMD 34600
Tender Value -
Place coimbatore
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=662735

Start Date May 08, 2025 18:30
End Date
Expired 26/05/2025

Expired 486 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Cridp work -2024-25 soil slope stabilization 44.8 ii

Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&amp#x0d construction of breast wall at km.44.8 ii of ooty kotagiri mettupalayam sathy gobi erode road

Read more
Cridp work 2024 25 slope stabilization protective wall at km.44.10

Providing slope stabilization work at km.45.4slope length 10mandproviding protective work at km.44.10 45.4 of ooty kothagiri mettupalayam sathy gobi erode road&amp#x0d construction of protective wallatkm.44.10ofooty kothagirimettupalayam sathygobieroderoad

Read more
Cridp work -2024-25 soil slope stabilization

Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&amp#x0d construction of breast wall at km.44.8 i of ooty kotagiri mettupalayam sathy gobi erode road

Read more
Cridp work -2024-25 soil slope stabilizationkm.44.8 iii top of hill side

Providing soilslope stabilization work and protective work at km.44.8 slopelength50m of ooty kotagiri mettupalayam sathy gobi erode road&amp#x0d construction of breast wall at km.44.8 iii top of hill sideofooty kotagiri mettupalayamsathygobi erode road

Read more
Slope stabilization-sdn

Balance work of slope stabilization work along the access road up to hill top for sumber station yard on dharm qazigund section udhampur-srinagar-baramulla new bg railway link railway project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise