Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cridp Work2024.25 Soil Slope Stabilization Protective Wall At Km.44.8
|
| Description |
Providing Soil Slope Stabilization Work And Protective Work At Km.44.8 Slope Length 50m Of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road &Amp#X0d
Construction Of Protective Wall At Km.44.8 Of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road&Amp#X0d
|
| Organisation | Highways | State Govt. and UT |
| Tender Id | 2025_HWAY_554892_1 |
|
Reference Number |
CRIDP Work2024.25 Soil Slope Stabilization Protective wall at Km.44.8 |
| Tender Fee | 0 |
| EMD | 34600 |
| Tender Value | - |
| Place | coimbatore |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=662735 |
| Start Date | May 08, 2025 18:30 |
| End Date |
Expired
26/05/2025
Expired 486 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreCridp work -2024-25 soil slope stabilization 44.8 ii
Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 ii of ooty kotagiri mettupalayam sathy gobi erode road
Read moreCridp work 2024 25 slope stabilization protective wall at km.44.10
Providing slope stabilization work at km.45.4slope length 10mandproviding protective work at km.44.10 45.4 of ooty kothagiri mettupalayam sathy gobi erode road&#x0d construction of protective wallatkm.44.10ofooty kothagirimettupalayam sathygobieroderoad
Read moreCridp work -2024-25 soil slope stabilization
Providing soil slope stabilization work and protective work at km.44.8 slope length 50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 i of ooty kotagiri mettupalayam sathy gobi erode road
Read moreCridp work -2024-25 soil slope stabilizationkm.44.8 iii top of hill side
Providing soilslope stabilization work and protective work at km.44.8 slopelength50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 iii top of hill sideofooty kotagiri mettupalayamsathygobi erode road
Read moreDust suppressor for slope and stabilization chemical dust control soil stabilization road construct
Read more
Slope stabilization-sdn
Balance work of slope stabilization work along the access road up to hill top for sumber station yard on dharm qazigund section udhampur-srinagar-baramulla new bg railway link railway project.
Read moreSlope stabilization using soil nailing method in km.8 4 of kuppanur kottachedu - valavanthi road m845
Slope stabilization using soil nailing method
Read moreof your Industry type