Tender Details

Particulars Details
Title
Design Supply And Erection Of Hydro Pneumatic Operated Lubrication System
Description
Design Supply And Erection Of Hydro Pneumatic Operated Lubrication System
Organisation Balmer Lawrie and Company Limited | Public Sector Undertakings
Tender Id 21347
Reference
Number
1090LM0330
Tender Fee 0
EMD 0
Tender Value -
Place Chittoor
Link
View Original Tender Notice

https://www.balmerlawrie.com/pages/tenderdetails/21347

Start Date April 04, 2025 10:34
End Date
Expired 15/04/2025

Expired 544 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco - nshes - design, engineering, supplying, erection, installation and testing of 50kld zinc alume fire water tank at nslcph, nshes, nagarjunasagar.

Tggenco - nshes - design, engineering, supplying, erection, installation and testing of 50kld zinc alume fire water tank at nslcph, nshes, nagarjunasagar.

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
High performance battery operated road sweeping machine to uas, gkvk-1no

High performance battery operated road sweeping machine to uas, gkvk-1no

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit

Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana

Read more
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system

Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system

Read more
Supply of pneumatic knife gate valve pistons for xrp 1043 bowl mill reject system

Supply of pneumatic knife gate valve pistons for xrp 1043 bowl mill reject system

Read more
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.

Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise